Racksquared Data Centers
Racksquared Data Centers is an operational data center operated by Racksquared in Columbus, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Racksquared |
| Networks | 1 networks, 1 internet exchanges PeeringDB. |
| Address | 325 E Spring Street |
| Coordinates | 39.96688, -82.99262 |
| Website | racksquared.com |
Power and grid
| Utility | City Of Columbus (municipal) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | PJM |
| Nearest gas pipeline | Columbia Gas Trans Co, interstate pipeline, 7.5 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 536 g CO₂ per kWh (Ohio, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 54.9%, coal 24.4%, nuclear 11.7%, solar 5.8%, wind 2%. Clean power: 20% |
| Industrial power price | USD 0.098 per kWh (Ohio, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 11 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38 °C (2001 to 2025) |
| Cooling degree days | 504 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.86 kWh per m² per day |
| Wind at 50 m | 6.3 m/s average |
| Water stress today | Low - Medium (10-20%) (Ohio) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How clean is the power for Racksquared Data Centers?
The grid in Ohio emits about 536 g CO₂ per kWh (2025). Largest sources: gas 54.9%, coal 24.4%, nuclear 11.7%.
Who operates Racksquared Data Centers?
Racksquared.
Data centers near Columbus
- Citynet Columbus 239 m
- WOW! Business (Columbus Datacenter) 254 m
- Cogent Columbus 290 m
- 180 E Broad St. 502 m
- Bresco Broadband Data Center 858 m
- Cogent Columbus 2 945 m
- Crown Castle Columbus (101 E Town) 958 m
- Google Columbus 11.8 km · 364 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.