American Tower RA1
American Tower RA1 is an operational data center operated by American Tower in Raleigh, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | American Tower |
| Networks | 1 networks, 1 internet exchanges PeeringDB. |
| Address | 6011 Chapel Hill Road |
| Coordinates | 35.78812, -78.72657 |
| Website | americantower.com/us/data-centers-edge |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 230 kV, 1.7 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 21 |
| Utility | North Carolina Eastern M P A (municipal mktg authority) Electric retail service territory (HIFLD, US government). |
| Nearest gas pipeline | Public Service Co of NC, intrastate pipeline, 1.4 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 2.3 GW in 67 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 350 g CO₂ per kWh (North Carolina, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 39.7%, nuclear 31.5%, coal 13.1%, solar 10.1%, hydro 3.4%. Clean power: 46.9% |
| Industrial power price | USD 0.082 per kWh (North Carolina, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 15.4 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 41.7 °C (2001 to 2025) |
| Cooling degree days | 1,000 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.37 kWh per m² per day |
| Wind at 50 m | 4.3 m/s average |
| Water stress today | High (40-80%) (North Carolina) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is American Tower RA1 to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (230 kV), about 1.7 km away. The local utility is North Carolina Eastern M P A.
How clean is the power for American Tower RA1?
The grid in North Carolina emits about 350 g CO₂ per kWh (2025). Largest sources: gas 39.7%, nuclear 31.5%, coal 13.1%.
Who operates American Tower RA1?
American Tower.
Data centers near Raleigh
- iGLASS Networks 5.7 km · 1.1 MW
- Segra Data Center 9.1 km · 12 MW
- Flexential - Raleigh (RAL01/02/03) 11.5 km
- Level(3) Raleigh 13.8 km
- Windstream Communications 15.3 km
- vXchnge Raleigh-Durham (NC01) 16.3 km
- TierPoint Research Triangle Park – RTP 18.3 km
- CyrusOne data center in Durham 21.4 km · 8.3 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.