iGLASS Networks
iGLASS Networks is an operational data center in Cary, United States. Our footprint estimate of its power is about 1.1 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 1.1 MW (range 0.5 MW to 1.7 MW) Estimate from building footprint, low confidence. Footprint estimate: about 891 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 470 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Commonwealth Court 211, 27511, Cary |
| Coordinates | 35.76675, -78.78399 |
Power and grid
| Utility | North Carolina Eastern M P A (municipal mktg authority) Electric retail service territory (HIFLD, US government). |
|---|---|
| Nearest gas pipeline | Public Service Co of NC, intrastate pipeline, 3.7 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 350 g CO₂ per kWh (North Carolina, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 39.7%, nuclear 31.5%, coal 13.1%, solar 10.1%, hydro 3.4%. Clean power: 46.9% |
| Industrial power price | USD 0.082 per kWh (North Carolina, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 15.4 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 41.7 °C (2001 to 2025) |
| Cooling degree days | 1,000 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.37 kWh per m² per day |
| Wind at 50 m | 4.3 m/s average |
| Water stress today | High (40-80%) (North Carolina) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does iGLASS Networks use?
We estimate the facility power at about 1.1 MW. Estimate from building footprint, low confidence.
How clean is the power for iGLASS Networks?
The grid in North Carolina emits about 350 g CO₂ per kWh (2025). Largest sources: gas 39.7%, nuclear 31.5%, coal 13.1%.
Data centers near Cary
- American Tower RA1 5.7 km
- Flexential - Raleigh (RAL01/02/03) 10.1 km
- Segra Data Center 11.9 km · 12 MW
- Windstream Communications 14.1 km
- vXchnge Raleigh-Durham (NC01) 15.5 km
- TierPoint Research Triangle Park – RTP 16.8 km
- Level(3) Raleigh 19.5 km
- CyrusOne data center in Durham 20.5 km · 8.3 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.