Segra Data Center
Segra Data Center is an operational data center in Raleigh, United States. Our footprint estimate of its power is about 12 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 12 MW (range 6.2 MW to 20 MW) Estimate from building footprint, low confidence. Footprint estimate: about 10,315 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 5,100 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Garner Station Boulevard 2100, 27603, Raleigh |
| Coordinates | 35.72499, -78.66236 |
| Website | northstate.net/technologysolutions |
Power and grid
| Utility | North Carolina Eastern M P A (municipal mktg authority) Electric retail service territory (HIFLD, US government). |
|---|---|
| Nearest gas pipeline | Public Service Co of NC, intrastate pipeline, 7.7 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 350 g CO₂ per kWh (North Carolina, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 39.7%, nuclear 31.5%, coal 13.1%, solar 10.1%, hydro 3.4%. Clean power: 46.9% |
| Industrial power price | USD 0.082 per kWh (North Carolina, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Water stress today | High (40-80%) (North Carolina) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
|---|---|
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Segra Data Center use?
We estimate the facility power at about 12 MW. Estimate from building footprint, low confidence.
How clean is the power for Segra Data Center?
The grid in North Carolina emits about 350 g CO₂ per kWh (2025). Largest sources: gas 39.7%, nuclear 31.5%, coal 13.1%.
Data centers near Raleigh
- American Tower RA1 9.1 km
- iGLASS Networks 11.9 km · 1.1 MW
- Level(3) Raleigh 15.5 km
- Flexential - Raleigh (RAL01/02/03) 20.5 km
- Windstream Communications 24.4 km
- vXchnge Raleigh-Durham (NC01) 25.4 km
- TierPoint Research Triangle Park – RTP 27.3 km
- CyrusOne data center in Durham 30.5 km · 8.3 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.