Data Center Directory

CyrusOne data center in Durham

CyrusOne data center in Durham is an operational data center operated by CyrusOne in Durham, United States. Our footprint estimate of its power is about 8.3 MW.

Key facts

StatusOperational
OperatorCyrusOne
Facility power8.3 MW (range 4.1 MW to 13 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 6,908 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 3,500 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressNortheast Creek Parkway 2223, 27713, Durham
Coordinates35.93389, -78.88095
Websitecyrusone.com/data-centers/north-america/durham-nc-dur1-dur2

Power and grid

Nearest high-voltage substationUnnamed substation, 100 kV, 400 m away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationUnnamed substation, 230 kV, 5.8 km away
HV substations within 10 km32
UtilityDuke Energy Carolinas, LLC (investor owned)
Electric retail service territory (HIFLD, US government).
Balancing authorityDUK
Nearest gas pipelinePublic Service Co of NC, intrastate pipeline, 200 m away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km2.2 GW in 48 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity350 g CO₂ per kWh (North Carolina, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 39.7%, nuclear 31.5%, coal 13.1%, solar 10.1%, hydro 3.4%. Clean power: 46.9%
Industrial power priceUSD 0.082 per kWh (North Carolina, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature15.4 °C
NASA POWER, average of 2001 to 2025.
Highest temperature41.7 °C (2001 to 2025)
Cooling degree days1,000 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.37 kWh per m² per day
Wind at 50 m4.3 m/s average
Water stress todayHigh (40-80%) (North Carolina)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050High (40-80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does CyrusOne data center in Durham use?

We estimate the facility power at about 8.3 MW. Estimate from building footprint, low confidence.

How close is CyrusOne data center in Durham to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (100 kV), about 400 m away. The local utility is Duke Energy Carolinas, LLC, in the DUK balancing area.

How clean is the power for CyrusOne data center in Durham?

The grid in North Carolina emits about 350 g CO₂ per kWh (2025). Largest sources: gas 39.7%, nuclear 31.5%, coal 13.1%.

Who operates CyrusOne data center in Durham?

CyrusOne.

Data centers near Durham

More CyrusOne data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.