CyrusOne data center in Durham is an operational data center operated by CyrusOne in Durham, United States. Our footprint estimate of its power is about 8.3 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | CyrusOne |
| Facility power | 8.3 MW (range 4.1 MW to 13 MW) Estimate from building footprint, low confidence. Footprint estimate: about 6,908 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 3,500 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Northeast Creek Parkway 2223, 27713, Durham |
| Coordinates | 35.93389, -78.88095 |
| Website | cyrusone.com/data-centers/north-america/durham-nc-dur1-dur2 |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 100 kV, 400 m away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Unnamed substation, 230 kV, 5.8 km away |
| HV substations within 10 km | 32 |
| Utility | Duke Energy Carolinas, LLC (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | DUK |
| Nearest gas pipeline | Public Service Co of NC, intrastate pipeline, 200 m away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 2.2 GW in 48 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 350 g CO₂ per kWh (North Carolina, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 39.7%, nuclear 31.5%, coal 13.1%, solar 10.1%, hydro 3.4%. Clean power: 46.9% |
| Industrial power price | USD 0.082 per kWh (North Carolina, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 15.4 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 41.7 °C (2001 to 2025) |
| Cooling degree days | 1,000 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.37 kWh per m² per day |
| Wind at 50 m | 4.3 m/s average |
| Water stress today | High (40-80%) (North Carolina) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does CyrusOne data center in Durham use?
We estimate the facility power at about 8.3 MW. Estimate from building footprint, low confidence.
How close is CyrusOne data center in Durham to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (100 kV), about 400 m away. The local utility is Duke Energy Carolinas, LLC, in the DUK balancing area.
How clean is the power for CyrusOne data center in Durham?
The grid in North Carolina emits about 350 g CO₂ per kWh (2025). Largest sources: gas 39.7%, nuclear 31.5%, coal 13.1%.
Who operates CyrusOne data center in Durham?
CyrusOne.
Data centers near Durham
- CyrusOne NC-1 287 m · 43 MW
- TierPoint Research Triangle Park – RTP 4.1 km
- vXchnge Raleigh-Durham (NC01) 5.1 km
- Windstream Communications 6.4 km
- Brandaleone Lab for Data and Visualization 9.3 km
- Flexential - Raleigh (RAL01/02/03) 10.5 km
- iGLASS Networks 20.5 km · 1.1 MW
- American Tower RA1 21.4 km
More CyrusOne data centers
- CyrusOne NVA5 United States
- CyrusOne FRA3 Germany
- CyrusOne Sterling United States
- CyrusOne Aurora I United States
- CyrusOne Sterling NVA9 United States
- CyrusOne NVA14 United States
- CyrusOne Lebanon United States
- CyrusOne NC-1 United States
Sources
Correct this page or get the data