Brandaleone Lab for Data and Visualization
Brandaleone Lab for Data and Visualization is an operational data center operated by Duke Libraries in Durham, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Duke Libraries |
| Coordinates | 36.00310, -78.93853 |
Power and grid
| Nearest high-voltage substation | Sub 2, 100 kV, 600 m away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Eno Substation, 230 kV, 8.4 km away |
| HV substations within 10 km | 26 |
| Utility | Duke Energy Carolinas, LLC (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | DUK |
| Nearest gas pipeline | Public Service Co of NC, intrastate pipeline, 4 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 2.2 GW in 41 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 350 g CO₂ per kWh (North Carolina, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 39.7%, nuclear 31.5%, coal 13.1%, solar 10.1%, hydro 3.4%. Clean power: 46.9% |
| Industrial power price | USD 0.082 per kWh (North Carolina, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 15.4 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 41.7 °C (2001 to 2025) |
| Cooling degree days | 1,000 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.37 kWh per m² per day |
| Wind at 50 m | 4.3 m/s average |
| Water stress today | High (40-80%) (North Carolina) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Brandaleone Lab for Data and Visualization to the power grid?
The nearest high-voltage substation in OpenStreetMap is Sub 2 (100 kV), about 600 m away. The local utility is Duke Energy Carolinas, LLC, in the DUK balancing area.
How clean is the power for Brandaleone Lab for Data and Visualization?
The grid in North Carolina emits about 350 g CO₂ per kWh (2025). Largest sources: gas 39.7%, nuclear 31.5%, coal 13.1%.
Who operates Brandaleone Lab for Data and Visualization?
Duke Libraries.
Data centers near Durham
- CyrusOne NC-1 9.1 km · 43 MW
- CyrusOne data center in Durham 9.3 km · 8.3 MW
- TierPoint Research Triangle Park – RTP 13.0 km
- vXchnge Raleigh-Durham (NC01) 14.4 km
- Windstream Communications 15.6 km
- Flexential - Raleigh (RAL01/02/03) 19.7 km
- iGLASS Networks 29.7 km · 1.1 MW
- American Tower RA1 30.6 km