Центр обработки данных "Авантаж" is an operational data center operated by MTS in Andreyevskoye, Russia. Our footprint estimate of its power is about 2.8 MW.

Key facts

StatusOperational
OperatorMTS
Facility power2.8 MW (range 1.1 MW to 7 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 23,177 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 1,200 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates55.56790, 37.95684

Power and grid

Grid carbon intensity447 g CO₂ per kWh (Russia, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 45.6%, nuclear 18.3%, coal 17.7%, hydro 16.7%, oil and other fossil 1%. Clean power: 35.7%

Climate and water

Average temperature4.6 °C
NASA POWER, average of 2001 to 2025.
Highest temperature36.4 °C (2001 to 2025)
Cooling degree days109 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy2.9 kWh per m² per day
Wind at 50 m6.5 m/s average
Water stress todayLow - Medium (10-20%) (Russia)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Центр обработки данных "Авантаж" use?

We estimate the facility power at about 2.8 MW. Estimate from building footprint, low confidence.

How clean is the power for Центр обработки данных "Авантаж"?

The grid in Russia emits about 447 g CO₂ per kWh (2025). Largest sources: gas 45.6%, nuclear 18.3%, coal 17.7%.

Who operates Центр обработки данных "Авантаж"?

MTS.