AT&T

AT&T is an operational data center in Palmdale, United States. Our footprint estimate of its power is about 1.7 MW.

Key facts

StatusOperational
Facility power1.7 MW (range 0.8 MW to 2.7 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 1,391 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 730 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressEast Palmdale Boulevard 901, 93550, Palmdale
Opened1974
Coordinates34.57998, -118.11401

Power and grid

Nearest high-voltage substationVincent Substation, 500 kV, 10.5 km away (Southern California Edison)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
UtilitySouthern California Edison Co (investor owned)
Electric retail service territory (HIFLD, US government).
Balancing authorityCISO
Nearest gas pipelineSouthern California Gas Co, intrastate pipeline, 9.6 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km10 GW in 115 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity189 g CO₂ per kWh (California, 2025)
Average of all power made in the area. Ember.
Grid power mixsolar 37.4%, gas 30.4%, hydro 11.7%, nuclear 7.3%, wind 6.7%. Clean power: 69.7%
Industrial power priceUSD 0.241 per kWh (California, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature16.7 °C
NASA POWER, average of 2001 to 2025.
Highest temperature44.8 °C (2001 to 2025)
Cooling degree days1,045 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy5.78 kWh per m² per day
Wind at 50 m4.7 m/s average
Water stress todayExtremely High (>80%) (California)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Extremely High (>80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does AT&T use?

We estimate the facility power at about 1.7 MW. Estimate from building footprint, low confidence.

How close is AT&T to the power grid?

The nearest high-voltage substation in OpenStreetMap is Vincent Substation (500 kV), about 10.5 km away. The local utility is Southern California Edison Co, in the CISO balancing area.

How clean is the power for AT&T?

The grid in California emits about 189 g CO₂ per kWh (2025). Largest sources: solar 37.4%, gas 30.4%, hydro 11.7%.