BB&T Data Center
BB&T Data Center is an operational data center in Wendell, United States. Our footprint estimate of its power is about 22 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 22 MW (range 11 MW to 35 MW) Estimate from building footprint, low confidence. Footprint estimate: about 18,355 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 9,400 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 35.83934, -78.32814 |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 115 kV, 2.7 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Unnamed substation, 230 kV, 6.1 km away |
| HV substations within 10 km | 3 |
| Utility | North Carolina Eastern M P A (municipal mktg authority) Electric retail service territory (HIFLD, US government). |
| Nearest gas pipeline | Public Service Co of NC, intrastate pipeline, 18.2 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 762 MW in 94 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 350 g CO₂ per kWh (North Carolina, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 39.7%, nuclear 31.5%, coal 13.1%, solar 10.1%, hydro 3.4%. Clean power: 46.9% |
| Industrial power price | USD 0.082 per kWh (North Carolina, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 15.4 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 41.7 °C (2001 to 2025) |
| Cooling degree days | 1,000 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.37 kWh per m² per day |
| Wind at 50 m | 4.3 m/s average |
| Water stress today | High (40-80%) (North Carolina) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does BB&T Data Center use?
We estimate the facility power at about 22 MW. Estimate from building footprint, low confidence.
How close is BB&T Data Center to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (115 kV), about 2.7 km away. The local utility is North Carolina Eastern M P A.
How clean is the power for BB&T Data Center?
The grid in North Carolina emits about 350 g CO₂ per kWh (2025). Largest sources: gas 39.7%, nuclear 31.5%, coal 13.1%.
Data centers near Wendell
- Level(3) Raleigh 24.3 km
- Segra Data Center 32.7 km · 12 MW
- American Tower RA1 36.4 km
- iGLASS Networks 41.9 km · 1.1 MW
- Flexential - Raleigh (RAL01/02/03) 45.2 km
- vXchnge Raleigh-Durham (NC01) 47.4 km
- Windstream Communications 47.4 km
- TierPoint Research Triangle Park – RTP 50.0 km