Bridge Data Centres MY06
Bridge Data Centres MY06 is an operational AI data center operated by ByteDance in Johor, Malaysia. Its power is about 315 MW. Epoch AI estimates about 221,000 H100-equivalent AI chips (A100, H100, B200).
Key facts
| Status | Operational |
|---|---|
| Operator | ByteDance |
| Users | ByteDance (likely) |
| Facility power | 315 MW Reported (Epoch AI or owner data) |
| IT power | 243 MW |
| AI compute | 221,000 H100-equivalents |
| AI chips | A100, H100, B200 Reported (Epoch AI or owner data) |
| GPU capacity if all AI | about 140,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Capital cost | USD 9.2 billion Epoch AI estimate, 2025 USD. |
| Address | Bridge Data Centres, Sedenak Tech Park, Johor, Malaysia |
| Coordinates | 1.71266, 103.52573 (city level) |
Build timeline
| Date | Power | H100e | What the satellite images and filings show |
|---|---|---|---|
| 2021-10-01 | 0 | 0 | Land clearing begins for campus 1, seen via satellite imagery. This start date is corroborated by the [Malaysian Investment Development Authority](https://www.mida.gov.my/media-release/bridge-data-centres-and-bytedance-celebrate-grand-opening-of-the-first-phase-hyperscale-data-centre-my06-in-johor-malaysia/), citing November for officially first breaking ground. |
| 2022-12-31 | 25 MW | 6,468 | Building 1 (MY06-1) is operational. The [SEC filing for Chindata](https://www.sec.gov/Archives/edgar/data/1807192/000095017022025569/cd-ex99_1.htm) and [local news sources](https://www.malaymail.com/news/money/2022/10/21/mida-malaysia-still-most-desirable-location-for-data-centre-hubs-in-the-region/34929) reported the building was in service as of October 20, but only a [subsequent filing](https://www.sec.gov/Archives/edgar/data/1807192/000095017023015950/cd-20221231.htm) confirmed 19 MW was utilized by December 31, so we conservatively assume December 31. |
| 2023-03-01 | 25 MW | 6,468 | [Drone footage](https://www.youtube.com/watch?v=ozi5G1Lt4Ew) indicates that Building 1 is operating at full capacity, with 4 of 5 cooling tower fans spinning. Building 2 has 2 of 21 fans spinning and some ongoing construction work, so we assume it's not fully operational yet. We estimate another 3 months until full utilization. |
| 2023-05-30 | 79 MW | 21,000 | Building 2 (MY06-2) is operational. |
| 2024-11-05 | 148 MW | 65,000 | Building 3 and 4 are operational. Building 3 was [originally scheduled](https://www.sec.gov/Archives/edgar/data/1807192/000119312523034103/d282677dex994.htm) for 2024Q4, and seemed partly operational in June, so it's likely to be fully utilized by this date. Building 4 was [scheduled](https://www.sec.gov/Archives/edgar/data/1807192/000095017023045611/cd-ex99_1.htm) for delivery starting 2024Q1, but it typically takes a few more months to fit out and reach full utilization, so we think it's only fully utilized by this date. At Campus 2, Buildings 5-7 and Building 9 are close to finishing construction while Buildings 8 and 10 shells are still under construction. The Campus 2 substation looks complete. |
| 2025-02-09 | 148 MW | 65,000 | Construction looks complete on Building 5, 6 and 7, but we allow 3 more months for fit-out and ramping before declaring them operational. |
| 2025-05-25 | 315 MW | 221,000 | Buildings 5-7 are operational. |
| 2025-09-23 | 315 MW | 221,000 | Buildings 8 and 9 look structurally complete. The remaining building, building 10, still has construction material around it and scaffolding on the roof, with cooling units yet to be installed. |
| 2026-03-03 | 315 MW | 221,000 | All cooling units are now installed on Building 10. [Drone footage](https://www.youtube.com/watch?v=BVdGV8FFaLw) from the same month shows most cooling units operating for Buildings 5-7, but none (or very few) for Buildings 8-10. So we don't think Buildings 8-10 are operating significantly yet. |
| 2026-09-13 | 315 MW | 221,000 | No visible construction work on Buildings 8-10, but no cars in their carparks either (whereas Building 7 has many cars). So we still don't think Buildings 8-10 are utilized. |
Source: Epoch AI Frontier Data Centers.
Chip deployments
| Date | Chip | Units | Basis |
|---|---|---|---|
| 2022-12-31 | A100 | 20,513 | Estimate |
| 2023-05-30 | A100 | 65,857 | Estimate |
| 2024-11-05 | H100 | 44,720 | Estimate |
| 2025-05-25 | B200 | 61,573 | Estimate |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Bridge Data Centres MY06 use?
Public data puts the facility power at about 315 MW. Reported (Epoch AI or owner data).
What chips does Bridge Data Centres MY06 use?
Reported chips: A100, H100, B200.
Who operates Bridge Data Centres MY06?
ByteDance. Reported users: ByteDance.
Data centers near Johor
- YTL Johor 9.7 km · 155 MW
- Data center in Kampung Sedenak 11.8 km · 10 MW
- Data center in Kawasan Penempatan Ulu Benut Lima 12.0 km · 40 MW
- Data center in Kawasan Penempatan Ulu Benut Lima 12.3 km · 15 MW
- Data center in Kawasan Penempatan Ulu Benut Lima 12.5 km · 17 MW
- Data center in Kawasan Penempatan Ulu Benut Lima 12.6 km · 9.9 MW
- MY06 12.7 km
- Data center in Kawasan Penempatan Ulu Benut Lima 12.8 km · 51 MW
More ByteDance data centers
- VNET Bayin Ulanqab China
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.