YTL Johor
YTL Johor is an operational data center that is still expanding, in Johor, Malaysia. Its power is about 155 MW, growing to about 389 MW by 2028-08. Epoch AI estimates about 154,000 H100-equivalent AI chips (B200, B300).
Power demand is growing at this site
Key facts
| Status | Operational, expanding |
|---|---|
| Facility power | 155 MW Reported (Epoch AI or owner data) |
| IT power | 113 MW |
| Planned power | 389 MW by 2028-08-01 Epoch AI timeline projection. |
| AI compute | 154,000 H100-equivalents → 585,000 planned |
| AI chips | B200, B300 Reported (Epoch AI or owner data) |
| GPU capacity if all AI | about 63,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Capital cost | USD 4.3 billion → 10.8 billion planned Epoch AI estimate, 2025 USD. |
| Address | YTL Green Data Centers, Kulai, Johor, Malaysia |
| Coordinates | 1.66667, 103.60000 (city level) |
Build timeline
| Date | Power | H100e | What the satellite images and filings show |
|---|---|---|---|
| 2023-11-01 | 0 | 0 | Land clearing begins for Building 1. |
| 2025-11-03 | 26 MW | 24,000 | Building 1 is operational with Nvidia GB200s, according to the [local investment development authority](https://www.midf.com.my/sites/corporate/files/2025-11/ytl_power-cu-all_systems_go_for_ai_dc-mbsbr-031125.pdf). |
| 2026-03-14 | 138 MW | 138,000 | Building 2 is operational, assuming 3 months to structural completion plus 3 months fit-out after this [video](https://youtu.be/HODHjDbFt10?si=749v3V9LD4gkTDE2&t=212). Solar panels are also being installed to the north west of the campus. |
| 2026-05-15 | 155 MW | 154,000 | Building 1 added 4 two-fan cooling towers (config 3), installed mid May of 2026. This capacity is not reflected in any disclosure (the building is still reported at 20MW IT load). |
| 2026-07-13 | 155 MW | 154,000 | Satellite imagery confirms Buildings 1 and 2 are structurally complete. Buildings 3 and 4 are underway, and construction equipment can be seen on the plot for Building 5. Extensive solar panel arrays have been built out. |
| 2028-08-01 (projected) | 389 MW | 585,000 | Estimate: all five AI buildings operational. The mean time from first ground activity to operational across buildings 1 and 2 was 25.6 (25.1 and 26.0 months). Buildings 3 and 4 have been underway since Mar 2026, and building 5's plot only has construction equipment as of Jul 2026, so +25 months gives Aug 2028 as campus completion. Company guidance is faster: capacity "expected to double to 600MW by the end of 2027" per [Kenanga via The Star](https://www.thestar.com.my/business/business-news/2026/06/24/dc-expansion-to-lift-ytl-power); JDC4 phases Sep-25/Sep-26/Sep-27 per [MIDF](https://www.midf.com.my/sites/corporate/files/2025-11/ytl_power-cu-all_systems_go_for_ai_dc-mbsbr-031125.pdf). The resulting ~429MW IT independently matches Kenanga's "expected IT load of 430MW" for the 600MW park ([Kenanga, 9 Dec 2024](https://www.kenanga.com.my/wp-content/uploads/2024/12/YTLPOWR-241209-CU-Kenanga.pdf)). |
Source: Epoch AI Frontier Data Centers.
Chip deployments
| Date | Chip | Units | Basis |
|---|---|---|---|
| 2025-11-03 | B200 | 9,576 | Estimate |
| 2026-03-14 | B300 | 45,144 | Estimate |
| 2026-05-15 | B300 | 51,192 | Estimate |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does YTL Johor use?
Public data puts the facility power at about 155 MW, with about 389 MW planned by 2028. Reported (Epoch AI or owner data).
What chips does YTL Johor use?
Reported chips: B200, B300.
Data centers near Johor
- Bridge Data Centres MY06 9.7 km · 315 MW
- DayOne Kempas 19.3 km · 590 MW
- Gp3 Data Center 19.9 km
- Data center in Kampung Sedenak 20.1 km · 10 MW
- Data center in Kawasan Penempatan Ulu Benut Lima 20.3 km · 40 MW
- Data center in Kawasan Penempatan Ulu Benut Lima 20.5 km · 15 MW
- Data center in Kawasan Penempatan Ulu Benut Lima 21.0 km · 49 MW
- Data center in Kawasan Penempatan Ulu Benut Lima 21.1 km · 17 MW