Data Center Directory

Centeris

Centeris is an operational data center in South Hill, United States. Our footprint estimate of its power is about 23 MW.

Key facts

StatusOperational
Facility power23 MW (range 9.2 MW to 57 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 190,768 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 9,800 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Also known asCenteris SH1 Colocation · Centeris SH2 Build-to-Suit
Coordinates47.15907, -122.27956
Websitecenteris.com/home

Power and grid

Nearest high-voltage substationAlderton Substation, 230 kV, 3.3 km away (Puget Sound Energy)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km8
UtilityPuget Sound Energy INC (investor owned)
Electric retail service territory (HIFLD, US government).
Balancing authorityPSEI
Nearest gas pipelineNorthwest Pipeline, interstate pipeline, 200 m away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km680 MW in 8 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity135 g CO₂ per kWh (Washington, 2025)
Average of all power made in the area. Ember.
Grid power mixhydro 62.8%, gas 15.7%, wind 8.3%, nuclear 7.5%, coal 3%. Clean power: 80.9%
Industrial power priceUSD 0.074 per kWh (Washington, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature9.4 °C
NASA POWER, average of 2001 to 2025.
Highest temperature37.9 °C (2001 to 2025)
Cooling degree days77 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.42 kWh per m² per day
Wind at 50 m3.5 m/s average
Water stress todayLow - Medium (10-20%) (Washington)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Centeris use?

We estimate the facility power at about 23 MW. Estimate from building footprint, low confidence.

How close is Centeris to the power grid?

The nearest high-voltage substation in OpenStreetMap is Alderton Substation (230 kV), about 3.3 km away. The local utility is Puget Sound Energy INC, in the PSEI balancing area.

How clean is the power for Centeris?

The grid in Washington emits about 135 g CO₂ per kWh (2025). Largest sources: hydro 62.8%, gas 15.7%, wind 8.3%.

Data centers near South Hill

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.