Centeris
Centeris is an operational data center in South Hill, United States. Our footprint estimate of its power is about 23 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 23 MW (range 9.2 MW to 57 MW) Estimate from building footprint, low confidence. Footprint estimate: about 190,768 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 9,800 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | Centeris SH1 Colocation · Centeris SH2 Build-to-Suit |
| Coordinates | 47.15907, -122.27956 |
| Website | centeris.com/home |
Power and grid
| Nearest high-voltage substation | Alderton Substation, 230 kV, 3.3 km away (Puget Sound Energy) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 8 |
| Utility | Puget Sound Energy INC (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | PSEI |
| Nearest gas pipeline | Northwest Pipeline, interstate pipeline, 200 m away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 680 MW in 8 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 135 g CO₂ per kWh (Washington, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 62.8%, gas 15.7%, wind 8.3%, nuclear 7.5%, coal 3%. Clean power: 80.9% |
| Industrial power price | USD 0.074 per kWh (Washington, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 9.4 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 37.9 °C (2001 to 2025) |
| Cooling degree days | 77 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.42 kWh per m² per day |
| Wind at 50 m | 3.5 m/s average |
| Water stress today | Low - Medium (10-20%) (Washington) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Centeris use?
We estimate the facility power at about 23 MW. Estimate from building footprint, low confidence.
How close is Centeris to the power grid?
The nearest high-voltage substation in OpenStreetMap is Alderton Substation (230 kV), about 3.3 km away. The local utility is Puget Sound Energy INC, in the PSEI balancing area.
How clean is the power for Centeris?
The grid in Washington emits about 135 g CO₂ per kWh (2025). Largest sources: hydro 62.8%, gas 15.7%, wind 8.3%.
Data centers near South Hill
- Colocation Northwest - South Hill 470 m
- Optic Fusion - Perkins Building 15.8 km
- Cogent Seattle 17.0 km
- Equinix SE4 - Seattle, Kent 29.2 km
- Wave Broadband Tahoma Terra Facility 35.6 km
- Centersquare Seattle (SEA1-B) 37.0 km · 20 MW
- Centersquare Seattle (SEA1-A) 37.1 km · 6.1 MW
- WowRack 37.2 km · 3.4 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.