Optic Fusion - Perkins Building
Optic Fusion - Perkins Building is an operational data center operated by Optic Fusion in Tacoma, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Optic Fusion |
| Networks | 4 networks PeeringDB. |
| Also known as | Colocation Northwest - Tacoma |
| Address | 1101 A Street |
| Coordinates | 47.25334, -122.43671 |
| Website | opticfusion.net/colocation/tacoma |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 115 kV, 700 m away (Tacoma Power) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Tacoma Substation, 500 kV, 5.1 km away |
| HV substations within 10 km | 40 |
| Utility | City Of Tacoma (municipal) Electric retail service territory (HIFLD, US government). |
| Balancing authority | TPWR |
| Nearest gas pipeline | Northwest Pipeline, interstate pipeline, 13.9 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 615 MW in 7 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 135 g CO₂ per kWh (Washington, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 62.8%, gas 15.7%, wind 8.3%, nuclear 7.5%, coal 3%. Clean power: 80.9% |
| Industrial power price | USD 0.074 per kWh (Washington, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 10.5 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38 °C (2001 to 2025) |
| Cooling degree days | 79 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.42 kWh per m² per day |
| Wind at 50 m | 3.5 m/s average |
| Water stress today | Low - Medium (10-20%) (Washington) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Optic Fusion - Perkins Building to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (115 kV), about 700 m away. The local utility is City Of Tacoma, in the TPWR balancing area.
How clean is the power for Optic Fusion - Perkins Building?
The grid in Washington emits about 135 g CO₂ per kWh (2025). Largest sources: hydro 62.8%, gas 15.7%, wind 8.3%.
Who operates Optic Fusion - Perkins Building?
Optic Fusion.
Data centers near Tacoma
- Cogent Seattle 12.5 km
- Centeris 15.8 km · 23 MW
- Colocation Northwest - South Hill 16.2 km
- Equinix SE4 - Seattle, Kent 23.4 km
- Centersquare Seattle (SEA1-A) 28.7 km · 6.1 MW
- Centersquare Seattle (SEA1-B) 28.7 km · 20 MW
- WowRack 28.8 km · 3.4 MW
- Intergate West / Digital.forest / Fortress 28.8 km · 3.8 MW