Wave Broadband Tahoma Terra Facility

Wave Broadband Tahoma Terra Facility is an operational data center in Yelm, United States. No power figure is public for this site yet.

Key facts

StatusOperational
Coordinates46.94143, -122.62506

Power and grid

Nearest high-voltage substationYelm Substation, 115 kV, 2.3 km away (Puget Sound Energy)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationSt Clair Substation, 230 kV, 13.4 km away
HV substations within 10 km4
UtilityPuget Sound Energy INC (investor owned)
Electric retail service territory (HIFLD, US government).
Balancing authorityPSEI
Nearest gas pipelineNorthwest Pipeline, interstate pipeline, 5.8 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km2.5 GW in 10 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity135 g CO₂ per kWh (Washington, 2025)
Average of all power made in the area. Ember.
Grid power mixhydro 62.8%, gas 15.7%, wind 8.3%, nuclear 7.5%, coal 3%. Clean power: 80.9%
Industrial power priceUSD 0.074 per kWh (Washington, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature9.4 °C
NASA POWER, average of 2001 to 2025.
Highest temperature37.9 °C (2001 to 2025)
Cooling degree days77 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.42 kWh per m² per day
Wind at 50 m3.5 m/s average
Water stress todayLow - Medium (10-20%) (Washington)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How close is Wave Broadband Tahoma Terra Facility to the power grid?

The nearest high-voltage substation in OpenStreetMap is Yelm Substation (115 kV), about 2.3 km away. The local utility is Puget Sound Energy INC, in the PSEI balancing area.

How clean is the power for Wave Broadband Tahoma Terra Facility?

The grid in Washington emits about 135 g CO₂ per kWh (2025). Largest sources: hydro 62.8%, gas 15.7%, wind 8.3%.