CenturyLink is an operational data center in Sunrise Manor, United States. Our footprint estimate of its power is about 1 MW.

Key facts

StatusOperational
Facility power1 MW (range 0.5 MW to 1.6 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 830 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 430 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates36.18300, -115.06267

Power and grid

Nearest high-voltage substationUnnamed substation, 138 kV, 4.2 km away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationUnnamed substation, 230 kV, 10.6 km away
HV substations within 10 km15
UtilityColorado River Comm Of Nevada (state)
Electric retail service territory (HIFLD, US government).
Balancing authorityNEVP
Nearest gas pipelineSouthwest Gas Corp, intrastate pipeline, 500 m away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km11 GW in 48 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity326 g CO₂ per kWh (Nevada, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 48.3%, solar 33.6%, other renewables 8.2%, coal 5.5%, hydro 4%. Clean power: 46.7%
Industrial power priceUSD 0.102 per kWh (Nevada, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature19.9 °C
NASA POWER, average of 2001 to 2025.
Highest temperature47.6 °C (2001 to 2025)
Cooling degree days1,870 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy5.64 kWh per m² per day
Wind at 50 m5.2 m/s average
Water stress todayHigh (40-80%) (Nevada)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050High (40-80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does CenturyLink use?

We estimate the facility power at about 1 MW. Estimate from building footprint, low confidence.

How close is CenturyLink to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (138 kV), about 4.2 km away. The local utility is Colorado River Comm Of Nevada, in the NEVP balancing area.

How clean is the power for CenturyLink?

The grid in Nevada emits about 326 g CO₂ per kWh (2025). Largest sources: gas 48.3%, solar 33.6%, other renewables 8.2%.

Data centers near Sunrise Manor

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.