Flexential - Las Vegas/North (LAS04) is an operational data center operated by Flexential in North Las Vegas, United States. Our footprint estimate of its power is about 10 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Flexential |
| Facility power | 10 MW (range 5 MW to 16 MW) Estimate from building footprint, low confidence. Footprint estimate: about 8,393 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 4,300 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 10 networks, 1 internet exchanges PeeringDB. |
| Also known as | Flexential Las Vegas - North |
| Address | 3330 E Lone Mountain Rd |
| Coordinates | 36.24801, -115.10127 |
| Website | flexential.com |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 138 kV, 1.5 km away (NV Energy) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Pecos Substation, 230 kV, 3 km away |
| HV substations within 10 km | 13 |
| Utility | Colorado River Comm Of Nevada (state) Electric retail service territory (HIFLD, US government). |
| Balancing authority | NEVP |
| Nearest gas pipeline | Kern River Gas Trans Co, interstate pipeline, 3.7 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 10 GW in 43 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 326 g CO₂ per kWh (Nevada, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 48.3%, solar 33.6%, other renewables 8.2%, coal 5.5%, hydro 4%. Clean power: 46.7% |
| Industrial power price | USD 0.102 per kWh (Nevada, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 19.9 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 47.6 °C (2001 to 2025) |
| Cooling degree days | 1,870 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.64 kWh per m² per day |
| Wind at 50 m | 5.2 m/s average |
| Water stress today | High (40-80%) (Nevada) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Flexential - Las Vegas/North (LAS04) use?
We estimate the facility power at about 10 MW. Estimate from building footprint, low confidence.
How close is Flexential - Las Vegas/North (LAS04) to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (138 kV), about 1.5 km away. The local utility is Colorado River Comm Of Nevada, in the NEVP balancing area.
How clean is the power for Flexential - Las Vegas/North (LAS04)?
The grid in Nevada emits about 326 g CO₂ per kWh (2025). Largest sources: gas 48.3%, solar 33.6%, other renewables 8.2%.
Who operates Flexential - Las Vegas/North (LAS04)?
Flexential.
Data centers near North Las Vegas
- Verizon North Las Vegas 5.0 km · 2.3 MW
- CenturyLink 8.0 km · 1 MW
- Flexential - Las Vegas/Downtown (LAS03) 9.6 km
- Verizon 11.7 km · 2.2 MW
- CenturyLink 11.7 km
- Switch Las Vegas 4 11.8 km · 2.4 MW
- Google Storey County 18.8 km · 214 MW
- EdgeConneX Las Vegas (EDCLAS01) 20.5 km
More Flexential data centers
- Douglasville 2 United States
- Flexential - Atlanta/Douglasville (ATL5) United States
- Flexential - Portland/Hillsboro 3 (PDX03) United States
- Flexential - Dallas/Plano (DFW01) United States
- Flexential - Denver/Englewood (DEN11) United States
- Flexential - Portland/Hillsboro 2 (PDX02) United States
- Flexential Dallas - Richardson United States
- Flexential - Portland/Hillsboro 4 (PDX04) United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.