Verizon North Las Vegas

Verizon North Las Vegas is an operational data center operated by Verizon in North Las Vegas, United States. Our footprint estimate of its power is about 2.3 MW.

Key facts

StatusOperational
OperatorVerizon
Facility power2.3 MW (range 1.1 MW to 3.6 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 1,882 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 980 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates36.22189, -115.14705

Power and grid

Nearest high-voltage substationUnnamed substation, 138 kV, 1 km away (NV Energy)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationPecos Substation, 230 kV, 7.4 km away
HV substations within 10 km20
UtilityColorado River Comm Of Nevada (state)
Electric retail service territory (HIFLD, US government).
Balancing authorityNEVP
Nearest gas pipelineSouthwest Gas Corp, intrastate pipeline, 3.8 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km10 GW in 44 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity326 g CO₂ per kWh (Nevada, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 48.3%, solar 33.6%, other renewables 8.2%, coal 5.5%, hydro 4%. Clean power: 46.7%
Industrial power priceUSD 0.102 per kWh (Nevada, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature19.9 °C
NASA POWER, average of 2001 to 2025.
Highest temperature47.6 °C (2001 to 2025)
Cooling degree days1,870 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy5.64 kWh per m² per day
Wind at 50 m5.2 m/s average
Water stress todayHigh (40-80%) (Nevada)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050High (40-80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Verizon North Las Vegas use?

We estimate the facility power at about 2.3 MW. Estimate from building footprint, low confidence.

How close is Verizon North Las Vegas to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (138 kV), about 1 km away. The local utility is Colorado River Comm Of Nevada, in the NEVP balancing area.

How clean is the power for Verizon North Las Vegas?

The grid in Nevada emits about 326 g CO₂ per kWh (2025). Largest sources: gas 48.3%, solar 33.6%, other renewables 8.2%.

Who operates Verizon North Las Vegas?

Verizon.

Data centers near North Las Vegas

More Verizon data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.