Cibicom Taulov
Cibicom Taulov is an operational data center operated by Cibicom A/S in Fredericia, Denmark. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Cibicom A/S |
| Address | Nordensvej 25 |
| Coordinates | 55.54154, 9.64823 |
| Website | cibicom.dk/datacenter |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 150 kV, 1.9 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | 400kV Skærbækværket, 400 kV, 3.9 km away |
| HV substations within 10 km | 6 |
| Power plants within 50 km | 922 MW in 14 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 120 g CO₂ per kWh (Denmark, 2025) Average of all power made in the area. Ember. |
| Grid power mix | wind 56.9%, bioenergy 21.4%, solar 12.8%, oil and other fossil 4.9%, coal 2.5%. Clean power: 91.2% |
| Industrial power price | EUR 0.118 per kWh (Denmark, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 8.6 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 28.2 °C (2001 to 2025) |
| Cooling degree days | 26 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.83 kWh per m² per day |
| Wind at 50 m | 7.6 m/s average |
| Water stress today | Low (<10%) (Denmark) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Cibicom Taulov to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (150 kV), about 1.9 km away.
How clean is the power for Cibicom Taulov?
The grid in Denmark emits about 120 g CO₂ per kWh (2025). Largest sources: wind 56.9%, bioenergy 21.4%, solar 12.8%.
Who operates Cibicom Taulov?
Cibicom A/S.
Data centers near Fredericia
- Google Data Center Fredericia 1.9 km · 64 MW
- GlobalConnect Kolding 10.9 km
- Norlys Kolding 11.0 km
- GlobalConnect Odense 52.7 km
- Novo Nordisk Gefion 53.1 km · 2.9 MW
- Meta Odense Data Center 55.9 km · 60 MW
- Meta Odense Data center 56.2 km · 136 MW
- GlobalConnect Stilling 62.1 km
More Cibicom A/S data centers
- Cibicom Datacenter Aarhus Denmark
- Cibicom Datacenter Aarhus North Denmark
- Cibicom Datacenter Ballerup Denmark
- Cibicom Datacenter CPH West Denmark
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.