Cogent Cheyenne
Cogent Cheyenne is an operational data center operated by Cogent Communications in Cheyenne, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Cogent Communications |
| Address | 114 West 10th Street |
| Coordinates | 41.12792, -104.81162 |
| Website | cogentco.com/en/cogent-great-plains |
Power and grid
| Utility | Cheyenne Light Fuel & Power (investor owned) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | WACM |
| Nearest gas pipeline | Wyoming Interstate PL Co, interstate pipeline, 12.5 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 145 g CO₂ per kWh (South Dakota, 2025) Average of all power made in the area. Ember. |
| Grid power mix | wind 58%, hydro 22.3%, coal 9.3%, gas 8.5%, solar 2%. Clean power: 82.3% |
| Industrial power price | USD 0.094 per kWh (South Dakota, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 8.2 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 37.4 °C (2001 to 2025) |
| Cooling degree days | 304 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.57 kWh per m² per day |
| Wind at 50 m | 7.1 m/s average |
| Water stress today | Low - Medium (10-20%) (South Dakota) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How clean is the power for Cogent Cheyenne?
The grid in South Dakota emits about 145 g CO₂ per kWh (2025). Largest sources: wind 58%, hydro 22.3%, coal 9.3%.
Who operates Cogent Cheyenne?
Cogent Communications.
Data centers near Cheyenne
- Meta Cheyenne 1.5 km · 182 MW
- Meta Cheyenne Data Center 5.5 km · 215 MW
- Mountain West Technologies - Cheyenne 5.5 km
- Data center in Cheyenne 5.7 km · 30 MW
- Data center in Cheyenne 5.8 km · 25 MW
- Lunavi - Cheyenne 5.9 km
- MineOne Wyoming Data Center 7.0 km · 4.6 MW
- University Corporation for Atmospheric Research data center in Cheyenne 7.1 km · 6.4 MW
More Cogent Communications data centers
- Cogent Elkridge United States
- Cogent Data Center United States
- Cogent Dijon France
- Cogent Toulouse France
- Cogent Tours France
- Cogent Lille France
- Cogent Rouen France
- Omaha Switch United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.