Cortex supercomputer
Cortex supercomputer is an operational data center in Hornsby Bend, United States. Our footprint estimate of its power is about 58 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 58 MW (range 29 MW to 93 MW) Estimate from building footprint, low confidence. Footprint estimate: about 48,382 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 25,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 30.21562, -97.61894 |
Power and grid
| Utility | Bluebonnet Electric Coop, INC (cooperative) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | ERCO |
| Nearest gas pipeline | El Paso Texas Pipeline Co, intrastate pipeline, 1.8 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 379 g CO₂ per kWh (Texas, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 48.3%, wind 21.7%, coal 11.6%, solar 10.7%, nuclear 7%. Clean power: 39.8% |
| Industrial power price | USD 0.072 per kWh (Texas, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 20.6 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 44.6 °C (2001 to 2025) |
| Cooling degree days | 1,858 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.81 kWh per m² per day |
| Wind at 50 m | 6.1 m/s average |
| Water stress today | High (40-80%) (Texas) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Cortex supercomputer use?
We estimate the facility power at about 58 MW. Estimate from building footprint, low confidence.
How clean is the power for Cortex supercomputer?
The grid in Texas emits about 379 g CO₂ per kWh (2025). Largest sources: gas 48.3%, wind 21.7%, coal 11.6%.
Data centers near Hornsby Bend
- Tesla Cortex 787 m · 71 MW
- Data Foundry Austin 1 7.3 km · 9.1 MW
- Digital Realty AUS11 - Austin 7.4 km · 19 MW
- Cogent Austin 7.6 km
- CyrusOne Austin (Met 2) 7.7 km · 2.7 MW
- CyrusOne Austin (Met 3) 7.9 km · 6 MW
- LightEdge Austin 2 (AUS2) 8.6 km · 18 MW
- LightEdge Austin 1 (AUS1) 9.0 km · 5.3 MW