Data center in Aurora is an operational data center in Aurora, United States. Our footprint estimate of its power is about 31 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 31 MW (range 15 MW to 49 MW) Estimate from building footprint, low confidence. Footprint estimate: about 25,746 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 13,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | East 6th Avenue 23505, 80018, Aurora |
| Coordinates | 39.72956, -104.71278 |
Power and grid
| Utility | Public Service Co Of Colorado (investor owned) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | PSCO |
| Nearest gas pipeline | Colorado Interstate Gas Co, interstate pipeline, 200 m away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 400 g CO₂ per kWh (Colorado, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 30.6%, wind 29%, coal 23.7%, solar 13.2%, hydro 3.2%. Clean power: 45.6% |
| Industrial power price | USD 0.100 per kWh (Colorado, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Water stress today | Extremely High (>80%) (Colorado) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
|---|---|
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data center in Aurora use?
We estimate the facility power at about 31 MW. Estimate from building footprint, low confidence.
How clean is the power for Data center in Aurora?
The grid in Colorado emits about 400 g CO₂ per kWh (2025). Largest sources: gas 30.6%, wind 29%, coal 23.7%.
Data centers near Aurora
- QTS 457 m · 23 MW
- QTS 650 m · 25 MW
- 365 Data Centers Aurora (CO1) 5.5 km
- Sungard AS Aurora 5.6 km
- Flexential - Denver/Aurora (DEN03) 14.0 km
- Flexential - Denver/Centennial (DEN05) 18.7 km · 4 MW
- Xfinity/Comcast Data Center 18.7 km · 5.4 MW
- Time Warner Datacenter 19.2 km · 5.3 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.