Data Center Directory

Data center in Ballenger Creek

Data center in Ballenger Creek is an operational data center in Ballenger Creek, United States. Our footprint estimate of its power is about 11 MW.

Key facts

StatusOperational
Facility power11 MW (range 5.3 MW to 17 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 8,758 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 4,700 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates39.37778, -77.41154

Power and grid

Nearest high-voltage substationLime Kiln Substation, 230 kV, 2.7 km away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km5
UtilityThe Potomac Edison Company (investor owned)
Electric retail service territory (HIFLD, US government).
Balancing authorityPJM
Nearest gas pipelineDominion Transmission Co, interstate pipeline, 15.3 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km1.4 GW in 40 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity387 g CO₂ per kWh (Pennsylvania, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 58%, nuclear 30.3%, coal 7.1%, wind 1.4%, solar 1.4%. Clean power: 34.3%
Industrial power priceUSD 0.105 per kWh (Pennsylvania, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature11.8 °C
NASA POWER, average of 2001 to 2025.
Highest temperature39.7 °C (2001 to 2025)
Cooling degree days628 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.98 kWh per m² per day
Wind at 50 m5.3 m/s average
Water stress todayLow - Medium (10-20%) (Pennsylvania)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Data center in Ballenger Creek use?

We estimate the facility power at about 11 MW. Estimate from building footprint, low confidence.

How close is Data center in Ballenger Creek to the power grid?

The nearest high-voltage substation in OpenStreetMap is Lime Kiln Substation (230 kV), about 2.7 km away. The local utility is The Potomac Edison Company, in the PJM balancing area.

How clean is the power for Data center in Ballenger Creek?

The grid in Pennsylvania emits about 387 g CO₂ per kWh (2025). Largest sources: gas 58%, nuclear 30.3%, coal 7.1%.

Data centers near Ballenger Creek

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.