Data center in Ballenger Creek is an operational data center in Ballenger Creek, United States. Our footprint estimate of its power is about 11 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 11 MW (range 5.3 MW to 17 MW) Estimate from building footprint, low confidence. Footprint estimate: about 8,758 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 4,700 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 39.37778, -77.41154 |
Power and grid
| Nearest high-voltage substation | Lime Kiln Substation, 230 kV, 2.7 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 5 |
| Utility | The Potomac Edison Company (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | PJM |
| Nearest gas pipeline | Dominion Transmission Co, interstate pipeline, 15.3 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 1.4 GW in 40 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 387 g CO₂ per kWh (Pennsylvania, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 58%, nuclear 30.3%, coal 7.1%, wind 1.4%, solar 1.4%. Clean power: 34.3% |
| Industrial power price | USD 0.105 per kWh (Pennsylvania, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 11.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 39.7 °C (2001 to 2025) |
| Cooling degree days | 628 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.98 kWh per m² per day |
| Wind at 50 m | 5.3 m/s average |
| Water stress today | Low - Medium (10-20%) (Pennsylvania) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data center in Ballenger Creek use?
We estimate the facility power at about 11 MW. Estimate from building footprint, low confidence.
How close is Data center in Ballenger Creek to the power grid?
The nearest high-voltage substation in OpenStreetMap is Lime Kiln Substation (230 kV), about 2.7 km away. The local utility is The Potomac Edison Company, in the PJM balancing area.
How clean is the power for Data center in Ballenger Creek?
The grid in Pennsylvania emits about 387 g CO₂ per kWh (2025). Largest sources: gas 58%, nuclear 30.3%, coal 7.1%.
Data centers near Ballenger Creek
- Vantage VA3 34.3 km · 44 MW
- STACK NVA06 35.4 km · 62 MW
- Microsoft Leesburg Building 1 36.2 km · 31 MW
- Microsoft Leesburg Building 4 36.6 km · 26 MW
- Visa Operations Center East 36.7 km · 45 MW
- Microsoft Leesburg Building 5 36.9 km · 15 MW
- Amazon IAD-668 37.6 km · 29 MW
- NFDG Andromeda 37.7 km · 5.8 MW