Data center in Flint is an operational data center in Flint, United States. Our footprint estimate of its power is about 6.9 MW.

Key facts

StatusOperational
Facility power6.9 MW (range 3.5 MW to 11 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 5,753 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 2,900 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressExchange Drive 5225, 48507, Flint
Coordinates42.96873, -83.77958

Power and grid

UtilityConsumers Energy Co (investor owned)
Electric retail service territory (HIFLD, US government).
Balancing authorityMISO
Nearest gas pipelineMichigan Gas Storage Co, intrastate pipeline, 100 m away
US Energy Information Administration pipeline map. Straight-line distance.
Grid carbon intensity455 g CO₂ per kWh (Michigan, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 42%, coal 23.2%, nuclear 21.7%, wind 8%, solar 2.6%. Clean power: 34.5%
Industrial power priceUSD 0.090 per kWh (Michigan, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Water stress todayLow - Medium (10-20%) (Michigan)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Data center in Flint use?

We estimate the facility power at about 6.9 MW. Estimate from building footprint, low confidence.

How clean is the power for Data center in Flint?

The grid in Michigan emits about 455 g CO₂ per kWh (2025). Largest sources: gas 42%, coal 23.2%, nuclear 21.7%.

Data centers near Flint

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.