Data center in L'Ancienne-Lorette
Data center in L'Ancienne-Lorette is an operational data center in L'Ancienne-Lorette, Canada. Our footprint estimate of its power is about 24 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 24 MW (range 12 MW to 39 MW) Estimate from building footprint, low confidence. Footprint estimate: about 20,328 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 10,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 46.79016, -71.34740 |
Power and grid
| Nearest high-voltage substation | Poste de La Suète, 230 kV, 2 km away (Hydro-Québec) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 7 |
| Power plants within 50 km | 33 MW in 3 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 192 g CO₂ per kWh (Canada, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 52.8%, gas 19.7%, nuclear 12.8%, wind 8%, coal 2.7%. Clean power: 76.5% |
Climate and water
| Average temperature | 3.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 29.3 °C (2001 to 2025) |
| Cooling degree days | 56 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.34 kWh per m² per day |
| Wind at 50 m | 5 m/s average |
| Water stress today | Low - Medium (10-20%) (Canada) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data center in L'Ancienne-Lorette use?
We estimate the facility power at about 24 MW. Estimate from building footprint, low confidence.
How close is Data center in L'Ancienne-Lorette to the power grid?
The nearest high-voltage substation in OpenStreetMap is Poste de La Suète (230 kV), about 2 km away.
How clean is the power for Data center in L'Ancienne-Lorette?
The grid in Canada emits about 192 g CO₂ per kWh (2025). Largest sources: hydro 52.8%, gas 19.7%, nuclear 12.8%.
Data centers near L'Ancienne-Lorette
- Vantage Data Centers (QC2) 3.1 km · 14 MW
- Data center in Québec 3.4 km · 46 MW
- Quebec 2k H100 Cluster 11.3 km · 2.8 MW
- QScale 12.8 km · 13 MW