Data Center Directory

Quebec 2k H100 Cluster

Quebec 2k H100 Cluster is an operational AI data center in Québec, Canada. Its power is about 2.8 MW. Epoch AI estimates about 2,000 H100-equivalent AI chips (NVIDIA H100 SXM5 80GB).

Key facts

StatusOperational
Facility power2.8 MW
Reported (Epoch AI or owner data)
AI compute2,000 H100-equivalents
AI chipsNVIDIA H100 SXM5 80GB
Reported (Epoch AI or owner data)
Chip count2,000
Largest reported cluster at this site (Epoch AI).
GPU capacity if all AIabout 1,200 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressQuebec, Canada
Coordinates46.81219, -71.20279

Power and grid

Nearest high-voltage substationPoste de Limoilou, 235 kV, 2.5 km away (Hydro-Québec)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km7
Power plants within 50 km55 MW in 4 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity192 g CO₂ per kWh (Canada, 2025)
Average of all power made in the area. Ember.
Grid power mixhydro 52.8%, gas 19.7%, nuclear 12.8%, wind 8%, coal 2.7%. Clean power: 76.5%

Climate and water

Average temperature3.1 °C
NASA POWER, average of 2001 to 2025.
Highest temperature29.3 °C (2001 to 2025)
Cooling degree days56 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.34 kWh per m² per day
Wind at 50 m5 m/s average
Water stress todayLow - Medium (10-20%) (Canada)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

GPU clusters at this site

ClusterChipsCountPowerSince
Quebec 2k H100 ClusterNVIDIA H100 SXM5 80GB2,0002.8 MW2025-01-14

Source: Epoch AI GPU Clusters.

Satellite view

Questions

How much power does Quebec 2k H100 Cluster use?

Public data puts the facility power at about 2.8 MW. Reported (Epoch AI or owner data).

What chips does Quebec 2k H100 Cluster use?

Reported chips: NVIDIA H100 SXM5 80GB.

How close is Quebec 2k H100 Cluster to the power grid?

The nearest high-voltage substation in OpenStreetMap is Poste de Limoilou (235 kV), about 2.5 km away.

How clean is the power for Quebec 2k H100 Cluster?

The grid in Canada emits about 192 g CO₂ per kWh (2025). Largest sources: hydro 52.8%, gas 19.7%, nuclear 12.8%.

Data centers near Québec

Sources

Correct this page or get the data