Vantage Data Centers (QC2)
Vantage Data Centers (QC2) is an operational data center operated by Vantage Data Centers in Quebec, Canada. Our footprint estimate of its power is about 14 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Vantage Data Centers |
| Facility power | 14 MW (range 5.5 MW to 35 MW) Estimate from building footprint, low confidence. Footprint estimate: about 115,359 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 6,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 7 networks, 1 internet exchanges PeeringDB. |
| Also known as | Vantage Data Centers |
| Address | 2675 Boulevard du Parc Technologique |
| Coordinates | 46.79612, -71.30702 |
| Website | vantage-dc.com |
Power and grid
| Grid carbon intensity | 192 g CO₂ per kWh (Canada, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | hydro 52.8%, gas 19.7%, nuclear 12.8%, wind 8%, coal 2.7%. Clean power: 76.5% |
Climate and water
| Water stress today | Low - Medium (10-20%) (Canada) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
|---|---|
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Vantage Data Centers (QC2) use?
We estimate the facility power at about 14 MW. Estimate from building footprint, low confidence.
How clean is the power for Vantage Data Centers (QC2)?
The grid in Canada emits about 192 g CO₂ per kWh (2025). Largest sources: hydro 52.8%, gas 19.7%, nuclear 12.8%.
Who operates Vantage Data Centers (QC2)?
Vantage Data Centers.
Data centers near Quebec
- Data center in Québec 296 m · 46 MW
- Data center in L'Ancienne-Lorette 3.1 km · 24 MW
- Quebec 2k H100 Cluster 8.1 km · 2.8 MW
- QScale 13.4 km · 13 MW
More Vantage Data Centers data centers
- Vantage TX1 United States
- Vantage VA2 United States
- Vantage Data Center FRA21 Germany
- Vantage VA3 United States
- Vantage VA13 United States
- Vantage San Antonio II United States
- Vantage Data Centers - CWL1 United Kingdom
- Vantage Data Centers AZ1 Campus United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.