Data Center Directory

Vantage Data Centers (QC2)

Vantage Data Centers (QC2) is an operational data center operated by Vantage Data Centers in Quebec, Canada. Our footprint estimate of its power is about 14 MW.

Key facts

StatusOperational
OperatorVantage Data Centers
Facility power14 MW (range 5.5 MW to 35 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 115,359 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 6,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks7 networks, 1 internet exchanges
PeeringDB.
Also known asVantage Data Centers
Address2675 Boulevard du Parc Technologique
Coordinates46.79612, -71.30702
Websitevantage-dc.com

Power and grid

Grid carbon intensity192 g CO₂ per kWh (Canada, 2025)
Average of all power made in the area. Ember.
Grid power mixhydro 52.8%, gas 19.7%, nuclear 12.8%, wind 8%, coal 2.7%. Clean power: 76.5%

Climate and water

Water stress todayLow - Medium (10-20%) (Canada)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Vantage Data Centers (QC2) use?

We estimate the facility power at about 14 MW. Estimate from building footprint, low confidence.

How clean is the power for Vantage Data Centers (QC2)?

The grid in Canada emits about 192 g CO₂ per kWh (2025). Largest sources: hydro 52.8%, gas 19.7%, nuclear 12.8%.

Who operates Vantage Data Centers (QC2)?

Vantage Data Centers.

Data centers near Quebec

More Vantage Data Centers data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.