Data center in Québec
Data center in Québec is an operational data center in Québec, Canada. Our footprint estimate of its power is about 46 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 46 MW (range 23 MW to 73 MW) Estimate from building footprint, low confidence. Footprint estimate: about 18,972 m² building outline x 2 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 20,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Rue Jean-Luc-Giroux 725, G1P 0B8, Québec |
| Opened | 2022 |
| Coordinates | 46.79478, -71.30366 |
Power and grid
| Grid carbon intensity | 192 g CO₂ per kWh (Canada, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | hydro 52.8%, gas 19.7%, nuclear 12.8%, wind 8%, coal 2.7%. Clean power: 76.5% |
Climate and water
| Water stress today | Low - Medium (10-20%) (Canada) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
|---|---|
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data center in Québec use?
We estimate the facility power at about 46 MW. Estimate from building footprint, low confidence.
How clean is the power for Data center in Québec?
The grid in Canada emits about 192 g CO₂ per kWh (2025). Largest sources: hydro 52.8%, gas 19.7%, nuclear 12.8%.
Data centers near Québec
- Vantage Data Centers (QC2) 296 m · 14 MW
- Data center in L'Ancienne-Lorette 3.4 km · 24 MW
- Quebec 2k H100 Cluster 7.9 km · 2.8 MW
- QScale 13.3 km · 13 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.