Data center in Querenburg
Data center in Querenburg is an operational data center in Querenburg, Germany. Our footprint estimate of its power is about 2 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 2 MW (range 1 MW to 3.2 MW) Estimate from building footprint, low confidence. Footprint estimate: about 1,663 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 850 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 51.45046, 7.27834 |
Power and grid
| Nearest high-voltage substation | Station Laer, 220 kV, 2.4 km away (Amprion) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 23 |
| Power plants within 50 km | 10 GW in 60 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 334 g CO₂ per kWh (Germany, 2025) Average of all power made in the area. Ember. |
| Grid power mix | wind 26.6%, coal 21%, solar 18%, gas 16.8%, bioenergy 10.1%. Clean power: 58.5% |
| Industrial power price | EUR 0.146 per kWh (Germany, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 9.6 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 39.2 °C (2001 to 2025) |
| Cooling degree days | 116 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.96 kWh per m² per day |
| Wind at 50 m | 6.7 m/s average |
| Water stress today | Medium - High (20-40%) (Germany) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data center in Querenburg use?
We estimate the facility power at about 2 MW. Estimate from building footprint, low confidence.
How close is Data center in Querenburg to the power grid?
The nearest high-voltage substation in OpenStreetMap is Station Laer (220 kV), about 2.4 km away.
How clean is the power for Data center in Querenburg?
The grid in Germany emits about 334 g CO₂ per kWh (2025). Largest sources: wind 26.6%, coal 21%, solar 18%.
Data centers near Querenburg
- TMR Telehouse Bochum 5.9 km
- GFR DataCenter Bochum 6.5 km
- GFR DataCenter Herne 11.1 km
- DOKOM21 RZ Huckarde 13.6 km · 2.7 MW
- DOKOM21 RZ Hörde 16.0 km
- euNetworks Colocation Dortmund 16.5 km · 0.8 MW
- GELSEN-NET DC Resse 18.1 km
- NETMOUNTAINS® Datacenter VEL1 & VEL2 18.4 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.