GFR DataCenter Herne
GFR DataCenter Herne is an operational data center operated by Glasfaser Ruhr GmbH & Co. KG in Herne, Germany. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Glasfaser Ruhr GmbH & Co. KG |
| Networks | 4 networks, 1 internet exchanges PeeringDB. |
| Address | Grenzweg 18 |
| Coordinates | 51.54028, 7.20796 |
| Website | tmr.net/carrier/produkte/carrierhotel.html |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 110 kV, 200 m away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Unnamed substation, 220 kV, 1.8 km away |
| HV substations within 10 km | 38 |
| Power plants within 50 km | 10 GW in 58 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 334 g CO₂ per kWh (Germany, 2025) Average of all power made in the area. Ember. |
| Grid power mix | wind 26.6%, coal 21%, solar 18%, gas 16.8%, bioenergy 10.1%. Clean power: 58.5% |
| Industrial power price | EUR 0.146 per kWh (Germany, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 10 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38.8 °C (2001 to 2025) |
| Cooling degree days | 105 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.96 kWh per m² per day |
| Wind at 50 m | 6.6 m/s average |
| Water stress today | Medium - High (20-40%) (Germany) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is GFR DataCenter Herne to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (110 kV), about 200 m away.
How clean is the power for GFR DataCenter Herne?
The grid in Germany emits about 334 g CO₂ per kWh (2025). Largest sources: wind 26.6%, coal 21%, solar 18%.
Who operates GFR DataCenter Herne?
Glasfaser Ruhr GmbH & Co. KG.
Data centers near Herne
- TMR Telehouse Bochum 5.8 km
- GFR DataCenter Bochum 7.4 km
- GELSEN-NET DC Resse 7.6 km
- Data center in Querenburg 11.1 km · 2 MW
- GELSEN-NET Gelsenkirchen 12.5 km
- DOKOM21 RZ Huckarde 14.6 km · 2.7 MW
- EXA Edge DC Essen 17.0 km
- euNetworks Colocation Dortmund 19.5 km · 0.8 MW
More Glasfaser Ruhr GmbH & Co. KG data centers
- GFR DataCenter Bochum Germany
- TMR Telehouse Bochum Germany
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.