Data center in Temple
Data center in Temple is an operational data center in Temple, United States. Our footprint estimate of its power is about 27 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 27 MW (range 11 MW to 68 MW) Estimate from building footprint, low confidence. Footprint estimate: about 225,204 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 12,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 31.05741, -97.29883 |
Power and grid
| Utility | City Of Bartlett Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | ERCO |
| Nearest gas pipeline | Atmos Pipeline - Texas, intrastate pipeline, 3.3 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 379 g CO₂ per kWh (Texas, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 48.3%, wind 21.7%, coal 11.6%, solar 10.7%, nuclear 7%. Clean power: 39.8% |
| Industrial power price | USD 0.072 per kWh (Texas, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 19.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 44.9 °C (2001 to 2025) |
| Cooling degree days | 1,700 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.81 kWh per m² per day |
| Wind at 50 m | 6.3 m/s average |
| Water stress today | High (40-80%) (Texas) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data center in Temple use?
We estimate the facility power at about 27 MW. Estimate from building footprint, low confidence.
How clean is the power for Data center in Temple?
The grid in Texas emits about 379 g CO₂ per kWh (2025). Largest sources: gas 48.3%, wind 21.7%, coal 11.6%.
Data centers near Temple
- Meta Temple 9.6 km · 231 MW
- Meta Temple Data Center 10.4 km · 178 MW
- Data center in Temple 10.8 km · 62 MW
- OpenAI Stargate Milam 43.6 km
- DataBank Waco (ACT1) 57.5 km
- Riot Rockdale 57.7 km · 59 MW
- Riot Corsicana 125.7 km · 200 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.