DataBank Waco (ACT1)
DataBank Waco (ACT1) is an operational data center operated by DataBank in Waco, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | DataBank |
| Networks | 1 networks PeeringDB. |
| Address | 700 Austin Avenue |
| Coordinates | 31.55495, -97.13324 |
| Website | databank.com/data-centers/south-texas/tx2 |
Power and grid
| Utility | Hilco Electric Cooperative, INC. (cooperative) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | ERCO |
| Nearest gas pipeline | Atmos Pipeline - Texas, intrastate pipeline, 1.6 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 379 g CO₂ per kWh (Texas, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 48.3%, wind 21.7%, coal 11.6%, solar 10.7%, nuclear 7%. Clean power: 39.8% |
| Industrial power price | USD 0.072 per kWh (Texas, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Water stress today | High (40-80%) (Texas) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
|---|---|
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How clean is the power for DataBank Waco (ACT1)?
The grid in Texas emits about 379 g CO₂ per kWh (2025). Largest sources: gas 48.3%, wind 21.7%, coal 11.6%.
Who operates DataBank Waco (ACT1)?
DataBank.
Data centers near Waco
- Data center in Temple 52.2 km · 62 MW
- Meta Temple Data Center 52.2 km · 178 MW
- Meta Temple 52.3 km · 231 MW
- Data center in Temple 57.5 km · 27 MW
- Riot Corsicana 74.4 km · 200 MW
- Google Midlothian 98.6 km · 123 MW
- Google 98.7 km · 53 MW
- Google 98.9 km · 23 MW
More DataBank data centers
- Databank Orangeburg (LGA3) United States
- DataBank Salt Lake City (SLC2) United States
- DataBank Ashburn (IAD1) United States
- DataBank Dallas (DFW3) United States
- DataBank Las Vegas (LAS1) United States
- DataBank Dallas (DFW4) United States
- DataBank Minneapolis (MSP3) United States
- DataBank Seattle (SEA2) United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.