Meta Temple

Meta Temple is an operational AI data center operated by Meta in Temple, United States. Its power is about 231 MW. Epoch AI estimates about 202,000 H100-equivalent AI chips (B300).

Key facts

StatusOperational
OperatorMeta
UsersMeta
Facility power231 MW
Reported (Epoch AI or owner data)
IT power178 MW
AI compute202,000 H100-equivalents
AI chipsB300
Reported (Epoch AI or owner data)
GPU capacity if all AIabout 99,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Capital costUSD 6.7 billion
Epoch AI estimate, 2025 USD.
BuildersJE Dunn
Address2310 Eberhardt Rd, Temple, TX 76504
Coordinates31.12602, -97.36000

Build timeline

DatePowerH100eWhat the satellite images and filings show
2022-04-0100Land clearing begins.
2023-02-0500A traditional H-shaped Meta data center is partially built.
2023-04-0100The traditional Meta data center has been demolished mid-construction, in favor of Meta's new AI-optimized design.
2025-11-1500Building 1 and 2 look complete from outside, with all electrical and cooling equipment installed. Space is cleared for Building 3.
2025-12-09198 MW173,000Building 1 and 2 are operational. Activity related to the air quality permit (namely, emergency diesel generators) was reported to have started as of 2025-12-09. This is our best estimate, but note that the planned completion date in this [regulatory filing](https://www.tdlr.texas.gov/TABS/Search/Project/TABS2022017728) is 2026-03-01.
2026-02-24198 MW173,000Building 3 is under construction. An outline is visible for the building which has similar dimensions to those deployed at the Meta Prometheus site.
2026-09-30231 MW202,000Building 3 is operational. Based on the stated completion date in this [regulatory filing](https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026008019)

Source: Epoch AI Frontier Data Centers.

Chip deployments

DateChipUnitsBasis
2025-12-09B30068,571Estimate
2026-09-30B30080,139Estimate

Satellite view

Questions

How much power does Meta Temple use?

Public data puts the facility power at about 231 MW. Reported (Epoch AI or owner data).

What chips does Meta Temple use?

Reported chips: B300.

Who operates Meta Temple?

Meta. Reported users: Meta.

Data centers near Temple

More Meta data centers

Sources