Meta Temple
Meta Temple is an operational AI data center operated by Meta in Temple, United States. Its power is about 231 MW. Epoch AI estimates about 202,000 H100-equivalent AI chips (B300).
Key facts
| Status | Operational |
|---|---|
| Operator | Meta |
| Users | Meta |
| Facility power | 231 MW Reported (Epoch AI or owner data) |
| IT power | 178 MW |
| AI compute | 202,000 H100-equivalents |
| AI chips | B300 Reported (Epoch AI or owner data) |
| GPU capacity if all AI | about 99,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Capital cost | USD 6.7 billion Epoch AI estimate, 2025 USD. |
| Builders | JE Dunn |
| Address | 2310 Eberhardt Rd, Temple, TX 76504 |
| Coordinates | 31.12602, -97.36000 |
Build timeline
| Date | Power | H100e | What the satellite images and filings show |
|---|---|---|---|
| 2022-04-01 | 0 | 0 | Land clearing begins. |
| 2023-02-05 | 0 | 0 | A traditional H-shaped Meta data center is partially built. |
| 2023-04-01 | 0 | 0 | The traditional Meta data center has been demolished mid-construction, in favor of Meta's new AI-optimized design. |
| 2025-11-15 | 0 | 0 | Building 1 and 2 look complete from outside, with all electrical and cooling equipment installed. Space is cleared for Building 3. |
| 2025-12-09 | 198 MW | 173,000 | Building 1 and 2 are operational. Activity related to the air quality permit (namely, emergency diesel generators) was reported to have started as of 2025-12-09. This is our best estimate, but note that the planned completion date in this [regulatory filing](https://www.tdlr.texas.gov/TABS/Search/Project/TABS2022017728) is 2026-03-01. |
| 2026-02-24 | 198 MW | 173,000 | Building 3 is under construction. An outline is visible for the building which has similar dimensions to those deployed at the Meta Prometheus site. |
| 2026-09-30 | 231 MW | 202,000 | Building 3 is operational. Based on the stated completion date in this [regulatory filing](https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026008019) |
Source: Epoch AI Frontier Data Centers.
Chip deployments
| Date | Chip | Units | Basis |
|---|---|---|---|
| 2025-12-09 | B300 | 68,571 | Estimate |
| 2026-09-30 | B300 | 80,139 | Estimate |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Meta Temple use?
Public data puts the facility power at about 231 MW. Reported (Epoch AI or owner data).
What chips does Meta Temple use?
Reported chips: B300.
Who operates Meta Temple?
Meta. Reported users: Meta.
Data centers near Temple
- Meta Temple Data Center 804 m · 178 MW
- Data center in Temple 1.3 km · 62 MW
- Data center in Temple 9.6 km · 27 MW
- OpenAI Stargate Milam 53.1 km
- Riot Rockdale 67.0 km · 59 MW
- Riot Corsicana 123.3 km · 200 MW
More Meta data centers
- Meta Hyperion United States
- QTS Cedar Rapids United States
- Meta Prometheus United States
- Meta Bowling Green United States
- Meta Montgomery United States
- QTS Eagle Mountain United States
- Meta Huntsville Data Center United States
- Altoona Meta Data Center United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.