Riot Rockdale
Riot Rockdale is an operational data center in Rockdale, United States. Our footprint estimate of its power is about 59 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 59 MW (range 24 MW to 148 MW) Estimate from building footprint, low confidence. Footprint estimate: about 492,359 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 25,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 30.57323, -97.08010 |
Power and grid
| Utility | Bartlett Electric Coop, INC (cooperative) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | ERCO |
| Nearest gas pipeline | Atmos Pipeline - Texas, intrastate pipeline, 4 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 379 g CO₂ per kWh (Texas, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 48.3%, wind 21.7%, coal 11.6%, solar 10.7%, nuclear 7%. Clean power: 39.8% |
| Industrial power price | USD 0.072 per kWh (Texas, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Water stress today | High (40-80%) (Texas) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
|---|---|
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Riot Rockdale use?
We estimate the facility power at about 59 MW. Estimate from building footprint, low confidence.
How clean is the power for Riot Rockdale?
The grid in Texas emits about 379 g CO₂ per kWh (2025). Largest sources: gas 48.3%, wind 21.7%, coal 11.6%.
Data centers near Rockdale
- OpenAI Stargate Milam 22.5 km
- Thin-nology 51.8 km · 0.8 MW
- Switch: The Rock 57.5 km · 27 MW
- Data center in Temple 57.7 km · 27 MW
- Level(3) Austin (Kramer) 63.8 km
- Element Critical Austin AUS1 64.4 km · 11 MW
- Tesla Cortex 64.7 km · 71 MW
- Cortex supercomputer 65.2 km · 58 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.