Switch: The Rock
Switch: The Rock is an operational data center operated by Switch in Round Rock, United States. Our footprint estimate of its power is about 27 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Switch |
| Facility power | 27 MW (range 14 MW to 44 MW) Estimate from building footprint, low confidence. Footprint estimate: about 22,878 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 12,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 30.48802, -97.67253 |
Power and grid
| Utility | City Of Bartlett Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | ERCO |
| Nearest gas pipeline | Atmos Pipeline - Texas, intrastate pipeline, 3.3 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 379 g CO₂ per kWh (Texas, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 48.3%, wind 21.7%, coal 11.6%, solar 10.7%, nuclear 7%. Clean power: 39.8% |
| Industrial power price | USD 0.072 per kWh (Texas, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 20.2 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 44.6 °C (2001 to 2025) |
| Cooling degree days | 1,779 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.81 kWh per m² per day |
| Wind at 50 m | 6.2 m/s average |
| Water stress today | High (40-80%) (Texas) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Switch: The Rock use?
We estimate the facility power at about 27 MW. Estimate from building footprint, low confidence.
How clean is the power for Switch: The Rock?
The grid in Texas emits about 379 g CO₂ per kWh (2025). Largest sources: gas 48.3%, wind 21.7%, coal 11.6%.
Who operates Switch: The Rock?
Switch.
Data centers near Round Rock
- DataBank Austin (AUS1) 10.5 km
- Thin-nology 10.7 km · 0.8 MW
- Level(3) Austin (Kramer) 12.0 km
- TACC Lonestar6 12.3 km · 0.5 MW
- Element Critical Austin AUS1 16.4 km · 11 MW
- BESTNAP 24.8 km
- 1011 San Jacinto 24.9 km
- Dell Rattler 25.4 km · 0.2 MW
More Switch data centers
- Switch "The Keep" Data Centre Campus United States
- Switch Las Vegas 15 United States
- Tahoe Reno 1 United States
- Tahoe Reno 5 United States
- The Keep United States
- The Keep United States
- Switch12 United States
- Tahoe Reno 3 United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.