Data Center Directory

TACC Lonestar6

TACC Lonestar6 is an operational AI data center operated by University of Texas at Austin in Jollyville, United States. Its power is about 0.5 MW. Epoch AI estimates about 79 H100-equivalent AI chips (NVIDIA Quadro RTX 5000, NVIDIA V100, NVIDIA A100 PCIe).

Key facts

StatusOperational
OperatorUniversity of Texas at Austin
Facility power0.5 MW
Reported (Epoch AI or owner data)
AI compute79 H100-equivalents
AI chipsNVIDIA Quadro RTX 5000, NVIDIA V100, NVIDIA A100 PCIe
Reported (Epoch AI or owner data)
Chip count808
Largest reported cluster at this site (Epoch AI).
GPU capacity if all AIabout 210 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Address10100 Burnet Rd, Austin, TX 78758
Coordinates30.38781, -97.72678

Power and grid

Nearest high-voltage substationBalcones Substation, 138 kV, 500 m away (Austin Energy)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationGilleland Creek Substation, 345 kV, 14.8 km away
HV substations within 10 km24
UtilityAustin Energy (municipal)
Electric retail service territory (HIFLD, US government).
Balancing authorityERCO
Nearest gas pipelineKinder Morgan Texas Pipeline Co, intrastate pipeline, 4.1 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km2.8 GW in 16 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity379 g CO₂ per kWh (Texas, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 48.3%, wind 21.7%, coal 11.6%, solar 10.7%, nuclear 7%. Clean power: 39.8%
Industrial power priceUSD 0.072 per kWh (Texas, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature20.2 °C
NASA POWER, average of 2001 to 2025.
Highest temperature44.6 °C (2001 to 2025)
Cooling degree days1,779 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.81 kWh per m² per day
Wind at 50 m6.2 m/s average
Water stress todayHigh (40-80%) (Texas)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050High (40-80%)
Business-as-usual scenario.

GPU clusters at this site

ClusterChipsCountPowerSince
TACC FronteraNVIDIA Quadro RTX 5000 + NVIDIA V1008080.5 MW2019-08-31
TACC Lonestar6NVIDIA A100 PCIe2520.2 MW2022-11-14

Source: Epoch AI GPU Clusters.

Satellite view

Questions

How much power does TACC Lonestar6 use?

Public data puts the facility power at about 0.5 MW. Reported (Epoch AI or owner data).

What chips does TACC Lonestar6 use?

Reported chips: NVIDIA Quadro RTX 5000, NVIDIA V100, NVIDIA A100 PCIe.

How close is TACC Lonestar6 to the power grid?

The nearest high-voltage substation in OpenStreetMap is Balcones Substation (138 kV), about 500 m away. The local utility is Austin Energy, in the ERCO balancing area.

How clean is the power for TACC Lonestar6?

The grid in Texas emits about 379 g CO₂ per kWh (2025). Largest sources: gas 48.3%, wind 21.7%, coal 11.6%.

Who operates TACC Lonestar6?

University of Texas at Austin.

Data centers near Jollyville

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.