TACC Lonestar6
TACC Lonestar6 is an operational AI data center operated by University of Texas at Austin in Jollyville, United States. Its power is about 0.5 MW. Epoch AI estimates about 79 H100-equivalent AI chips (NVIDIA Quadro RTX 5000, NVIDIA V100, NVIDIA A100 PCIe).
Key facts
| Status | Operational |
|---|---|
| Operator | University of Texas at Austin |
| Facility power | 0.5 MW Reported (Epoch AI or owner data) |
| AI compute | 79 H100-equivalents |
| AI chips | NVIDIA Quadro RTX 5000, NVIDIA V100, NVIDIA A100 PCIe Reported (Epoch AI or owner data) |
| Chip count | 808 Largest reported cluster at this site (Epoch AI). |
| GPU capacity if all AI | about 210 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | 10100 Burnet Rd, Austin, TX 78758 |
| Coordinates | 30.38781, -97.72678 |
Power and grid
| Nearest high-voltage substation | Balcones Substation, 138 kV, 500 m away (Austin Energy) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Gilleland Creek Substation, 345 kV, 14.8 km away |
| HV substations within 10 km | 24 |
| Utility | Austin Energy (municipal) Electric retail service territory (HIFLD, US government). |
| Balancing authority | ERCO |
| Nearest gas pipeline | Kinder Morgan Texas Pipeline Co, intrastate pipeline, 4.1 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 2.8 GW in 16 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 379 g CO₂ per kWh (Texas, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 48.3%, wind 21.7%, coal 11.6%, solar 10.7%, nuclear 7%. Clean power: 39.8% |
| Industrial power price | USD 0.072 per kWh (Texas, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 20.2 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 44.6 °C (2001 to 2025) |
| Cooling degree days | 1,779 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.81 kWh per m² per day |
| Wind at 50 m | 6.2 m/s average |
| Water stress today | High (40-80%) (Texas) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
GPU clusters at this site
| Cluster | Chips | Count | Power | Since |
|---|---|---|---|---|
| TACC Frontera | NVIDIA Quadro RTX 5000 + NVIDIA V100 | 808 | 0.5 MW | 2019-08-31 |
| TACC Lonestar6 | NVIDIA A100 PCIe | 252 | 0.2 MW | 2022-11-14 |
Source: Epoch AI GPU Clusters.
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does TACC Lonestar6 use?
Public data puts the facility power at about 0.5 MW. Reported (Epoch AI or owner data).
What chips does TACC Lonestar6 use?
Reported chips: NVIDIA Quadro RTX 5000, NVIDIA V100, NVIDIA A100 PCIe.
How close is TACC Lonestar6 to the power grid?
The nearest high-voltage substation in OpenStreetMap is Balcones Substation (138 kV), about 500 m away. The local utility is Austin Energy, in the ERCO balancing area.
How clean is the power for TACC Lonestar6?
The grid in Texas emits about 379 g CO₂ per kWh (2025). Largest sources: gas 48.3%, wind 21.7%, coal 11.6%.
Who operates TACC Lonestar6?
University of Texas at Austin.
Data centers near Jollyville
- Level(3) Austin (Kramer) 1.7 km
- Element Critical Austin AUS1 5.9 km · 11 MW
- DataBank Austin (AUS1) 6.5 km
- Switch: The Rock 12.3 km · 27 MW
- BESTNAP 12.8 km
- 1011 San Jacinto 13.0 km
- Dell Rattler 13.4 km · 0.2 MW
- Thin-nology 13.5 km · 0.8 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.