Data Center Directory

Level(3) Austin (Kramer)

Level(3) Austin (Kramer) is an operational data center operated by Lumen Technologies in Austin, United States. No power figure is public for this site yet.

Key facts

StatusOperational
OperatorLumen Technologies
Address1825-A Kramer Ln
Coordinates30.38503, -97.70922
Websitelumen.com

Power and grid

UtilityAustin Energy (municipal)
Electric retail service territory (HIFLD, US government).
Balancing authorityERCO
Nearest gas pipelineKinder Morgan Texas Pipeline Co, intrastate pipeline, 3.7 km away
US Energy Information Administration pipeline map. Straight-line distance.
Grid carbon intensity379 g CO₂ per kWh (Texas, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 48.3%, wind 21.7%, coal 11.6%, solar 10.7%, nuclear 7%. Clean power: 39.8%
Industrial power priceUSD 0.072 per kWh (Texas, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature20.2 °C
NASA POWER, average of 2001 to 2025.
Highest temperature44.6 °C (2001 to 2025)
Cooling degree days1,779 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.81 kWh per m² per day
Wind at 50 m6.2 m/s average
Water stress todayHigh (40-80%) (Texas)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050High (40-80%)
Business-as-usual scenario.

Satellite view

Questions

How clean is the power for Level(3) Austin (Kramer)?

The grid in Texas emits about 379 g CO₂ per kWh (2025). Largest sources: gas 48.3%, wind 21.7%, coal 11.6%.

Who operates Level(3) Austin (Kramer)?

Lumen Technologies.

Data centers near Austin

More Lumen Technologies data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.