Element Critical Austin AUS1
Element Critical Austin AUS1 is an operational data center operated by Element Critical in Austin, United States. Our footprint estimate of its power is about 11 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Element Critical |
| Facility power | 11 MW (range 5.5 MW to 18 MW) Estimate from building footprint, low confidence. Footprint estimate: about 9,233 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 4,700 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 4 networks, 1 internet exchanges PeeringDB. |
| Also known as | Element Critical |
| Address | 8025 North Interstate Highway 35 |
| Coordinates | 30.34210, -97.69630 |
| Website | elementcritical.com/data-centers/austin-one |
Power and grid
| Utility | Austin Energy (municipal) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | ERCO |
| Nearest gas pipeline | Kinder Morgan Texas Pipeline Co, intrastate pipeline, 2 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 379 g CO₂ per kWh (Texas, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 48.3%, wind 21.7%, coal 11.6%, solar 10.7%, nuclear 7%. Clean power: 39.8% |
| Industrial power price | USD 0.072 per kWh (Texas, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 20.2 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 44.6 °C (2001 to 2025) |
| Cooling degree days | 1,779 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.81 kWh per m² per day |
| Wind at 50 m | 6.2 m/s average |
| Water stress today | High (40-80%) (Texas) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Element Critical Austin AUS1 use?
We estimate the facility power at about 11 MW. Estimate from building footprint, low confidence.
How clean is the power for Element Critical Austin AUS1?
The grid in Texas emits about 379 g CO₂ per kWh (2025). Largest sources: gas 48.3%, wind 21.7%, coal 11.6%.
Who operates Element Critical Austin AUS1?
Element Critical.
Data centers near Austin
- Level(3) Austin (Kramer) 4.9 km
- TACC Lonestar6 5.9 km · 0.5 MW
- 1011 San Jacinto 8.8 km
- BESTNAP 8.8 km
- Alpheus Austin (1905 E. 6th Street) 9.3 km · 4.9 MW
- Lumen Austin 3 9.3 km · 0.8 MW
- Dell Rattler 9.4 km · 0.2 MW
- DataBank Austin (AUS1) 12.3 km
More Element Critical data centers
- Element Critical Chicago CH1 United States
- Element Critical Northern Virginia VA1 United States
- Element Critical Chicago CH2 United States
- Element Critical Houston HOU1 United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.