Datacenter Oostkamp
Datacenter Oostkamp is an operational data center operated by Data Center United in Oostkamp, Belgium. Our footprint estimate of its power is about 3.3 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Data Center United |
| Facility power | 3.3 MW (range 1.6 MW to 5.2 MW) Estimate from building footprint, low confidence. Footprint estimate: about 2,727 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 1,400 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Zwartegatstraat 7, 8020, Oostkamp |
| Coordinates | 51.16666, 3.23618 |
| Website | datacenterunited.com/datacenters/datacenter-oostkamp-bruges |
Power and grid
| Grid carbon intensity | 151 g CO₂ per kWh (Belgium, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | nuclear 33.5%, gas 20.8%, wind 18.6%, solar 14.5%, oil and other fossil 7.1%. Clean power: 72.1% |
| Industrial power price | EUR 0.133 per kWh (Belgium, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Water stress today | Extremely High (>80%) (Belgium) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
|---|---|
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Datacenter Oostkamp use?
We estimate the facility power at about 3.3 MW. Estimate from building footprint, low confidence.
How clean is the power for Datacenter Oostkamp?
The grid in Belgium emits about 151 g CO₂ per kWh (2025). Largest sources: nuclear 33.5%, gas 20.8%, wind 18.6%.
Who operates Datacenter Oostkamp?
Data Center United.
Data centers near Oostkamp
- DCstar Datacenter Oostkamp DCO 140 m
- EXA Edge DC Bruges 6.8 km
- DCstar Datacenter Gent DCG 34.9 km · 3 MW
- Versatel Gent (Handelsdok Center) 36.6 km
- S10 36.9 km · 7.1 MW
- nLighten Gent BRU1 42.1 km
- Ghent Edge Data Center 42.2 km
- DC Moeskroen 46.1 km · 1.5 MW