S10
S10 is an operational data center in Gent, Belgium. Our footprint estimate of its power is about 7.1 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 7.1 MW (range 3.5 MW to 11 MW) Estimate from building footprint, low confidence. Footprint estimate: about 2,938 m² building outline x 2 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 3,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 51.02373, 3.71226 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does S10 use?
We estimate the facility power at about 7.1 MW. Estimate from building footprint, low confidence.
Data centers near Gent
- DCstar Datacenter Gent DCG 2.1 km · 3 MW
- Versatel Gent (Handelsdok Center) 4.7 km
- nLighten Gent BRU1 5.6 km
- Ghent Edge Data Center 5.6 km
- LCL Brussels West 25.9 km · 7 MW
- Datacenter Oostkamp 36.9 km · 3.3 MW
- DCstar Datacenter Oostkamp DCO 37.0 km
- EXA Edge DC Bruges 39.6 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.