DCstar Datacenter Gent DCG
DCstar Datacenter Gent DCG is an operational data center operated by DCStar in Ghent, Belgium. Our footprint estimate of its power is about 3 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | DCStar |
| Facility power | 3 MW (range 1.5 MW to 4.8 MW) Estimate from building footprint, low confidence. Footprint estimate: about 2,475 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 1,300 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 7 networks, 1 internet exchanges PeeringDB. |
| Also known as | Datacenter Gent |
| Address | Poortakkerstraat 33, 9051 Gent |
| Coordinates | 51.02681, 3.68334 |
| Website | dcstar.be/dcgent |
Power and grid
| Nearest high-voltage substation | Flora, 150 kV, 4.7 km away (Elia) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Horta, 380 kV, 11.2 km away |
| HV substations within 10 km | 7 |
| Power plants within 50 km | 4.5 GW in 37 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 151 g CO₂ per kWh (Belgium, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 33.5%, gas 20.8%, wind 18.6%, solar 14.5%, oil and other fossil 7.1%. Clean power: 72.1% |
| Industrial power price | EUR 0.133 per kWh (Belgium, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 10.4 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 36.4 °C (2001 to 2025) |
| Cooling degree days | 66 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.13 kWh per m² per day |
| Wind at 50 m | 6.8 m/s average |
| Water stress today | Extremely High (>80%) (Belgium) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does DCstar Datacenter Gent DCG use?
We estimate the facility power at about 3 MW. Estimate from building footprint, low confidence.
How close is DCstar Datacenter Gent DCG to the power grid?
The nearest high-voltage substation in OpenStreetMap is Flora (150 kV), about 4.7 km away.
How clean is the power for DCstar Datacenter Gent DCG?
The grid in Belgium emits about 151 g CO₂ per kWh (2025). Largest sources: nuclear 33.5%, gas 20.8%, wind 18.6%.
Who operates DCstar Datacenter Gent DCG?
DCStar.
Data centers near Ghent
- S10 2.1 km · 7.1 MW
- Versatel Gent (Handelsdok Center) 5.5 km
- nLighten Gent BRU1 7.3 km
- Ghent Edge Data Center 7.4 km
- LCL Brussels West 27.9 km · 7 MW
- Datacenter Oostkamp 34.9 km · 3.3 MW
- DCstar Datacenter Oostkamp DCO 35.0 km
- EXA Edge DC Bruges 37.5 km
More DCStar data centers
- DCstar Datacenter Burcht DCB Belgium
- DCstar Datacenter Oostkamp DCO Belgium
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.