Elektra
Elektra is an operational data center in Hani i Elezit, Kosovo. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Address | Adem Jashari, 71510, Hani i Elezit |
| Coordinates | 42.14983, 21.29859 |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 110 kV, 300 m away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Unnamed substation, 400 kV, 18.1 km away |
| HV substations within 10 km | 1 |
| Power plants within 50 km | 269 MW in 4 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 903 g CO₂ per kWh (Kosovo, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 89.1%, wind 6.3%, hydro 4%. Clean power: 10.8% |
| Industrial power price | EUR 0.132 per kWh (Kosovo, 2025-S2) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 10.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 40.9 °C (2001 to 2025) |
| Cooling degree days | 390 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.94 kWh per m² per day |
| Wind at 50 m | 3.4 m/s average |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Elektra to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (110 kV), about 300 m away.
How clean is the power for Elektra?
The grid in Kosovo emits about 903 g CO₂ per kWh (2025). Largest sources: coal 89.1%, wind 6.3%, hydro 4%.
Data centers near Hani i Elezit
- Faculty of Computer Science and Engineering 18.6 km
- ФИНКИ data center in Skopje 18.6 km
- Ss. Cyril and Methodius University - Rectorate 20.5 km
- Neotel DC Skopje 21.8 km
- Telesmart DC Skopje 22.5 km