Neotel DC Skopje

Neotel DC Skopje is an operational data center operated by Neotel AD Skopje in Skopje, North Macedonia. No power figure is public for this site yet.

Key facts

StatusOperational
OperatorNeotel AD Skopje
Networks3 networks
PeeringDB.
AddressKuzman Josifovski Pitu 15
Coordinates41.98932, 21.45009
Websiteneodc.mk

Power and grid

Nearest high-voltage substationТС Југ Нова, 110 kV, 800 m away (ЕВН Македонија)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationUnnamed substation, 400 kV, 5.5 km away
HV substations within 10 km7
Power plants within 50 km269 MW in 4 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity467 g CO₂ per kWh (North Macedonia, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 34%, solar 20.4%, hydro 19.8%, gas 17.9%, wind 4.3%. Clean power: 45.4%
Industrial power priceEUR 0.112 per kWh (North Macedonia, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature10.8 °C
NASA POWER, average of 2001 to 2025.
Highest temperature40.9 °C (2001 to 2025)
Cooling degree days390 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.94 kWh per m² per day
Wind at 50 m3.4 m/s average
Water stress todayHigh (40-80%) (North Macedonia)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050High (40-80%)
Business-as-usual scenario.

Satellite view

Questions

How close is Neotel DC Skopje to the power grid?

The nearest high-voltage substation in OpenStreetMap is ТС Југ Нова (110 kV), about 800 m away.

How clean is the power for Neotel DC Skopje?

The grid in North Macedonia emits about 467 g CO₂ per kWh (2025). Largest sources: coal 34%, solar 20.4%, hydro 19.8%.

Who operates Neotel DC Skopje?

Neotel AD Skopje.