Telesmart DC Skopje
Telesmart DC Skopje is an operational data center operated by Telesmart Telekom doo in Skopje, North Macedonia. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Telesmart Telekom doo |
| Networks | 2 networks, 1 internet exchanges PeeringDB. |
| Address | Bul. Kiro Gligorov 4, Bul. Nikola Parapunov bb |
| Coordinates | 41.99509, 21.47495 |
| Website | en.telesmart.mk/colocation |
Power and grid
| Nearest high-voltage substation | ТС Аеродром, 110 kV, 700 m away (Електродистрибуција) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Unnamed substation, 400 kV, 5 km away |
| HV substations within 10 km | 7 |
| Power plants within 50 km | 269 MW in 4 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 467 g CO₂ per kWh (North Macedonia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 34%, solar 20.4%, hydro 19.8%, gas 17.9%, wind 4.3%. Clean power: 45.4% |
| Industrial power price | EUR 0.112 per kWh (North Macedonia, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 10.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 40.9 °C (2001 to 2025) |
| Cooling degree days | 390 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.94 kWh per m² per day |
| Wind at 50 m | 3.4 m/s average |
| Water stress today | High (40-80%) (North Macedonia) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Telesmart DC Skopje to the power grid?
The nearest high-voltage substation in OpenStreetMap is ТС Аеродром (110 kV), about 700 m away.
How clean is the power for Telesmart DC Skopje?
The grid in North Macedonia emits about 467 g CO₂ per kWh (2025). Largest sources: coal 34%, solar 20.4%, hydro 19.8%.
Who operates Telesmart DC Skopje?
Telesmart Telekom doo.
Data centers near Skopje
- Neotel DC Skopje 2.2 km
- Ss. Cyril and Methodius University - Rectorate 3.9 km
- Faculty of Computer Science and Engineering 5.5 km
- ФИНКИ data center in Skopje 5.5 km
- Elektra 22.5 km
- :IW Connect 108.6 km · 0.8 MW
Sources
Correct this page or get the data