Data Center Directory

:IW Connect

:IW Connect is an operational data center in Bitola, North Macedonia. Our footprint estimate of its power is about 0.8 MW.

Key facts

StatusOperational
Facility power0.8 MW (range 0.4 MW to 1.3 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 700 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 340 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates41.02692, 21.30406

Power and grid

Nearest high-voltage substationUnnamed substation, 110 kV, 3.7 km away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationБитола 2, 400 kV, 14.5 km away
HV substations within 10 km3
Power plants within 50 km1.0 GW in 2 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity467 g CO₂ per kWh (North Macedonia, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 34%, solar 20.4%, hydro 19.8%, gas 17.9%, wind 4.3%. Clean power: 45.4%
Industrial power priceEUR 0.112 per kWh (North Macedonia, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature10.7 °C
NASA POWER, average of 2001 to 2025.
Highest temperature38.9 °C (2001 to 2025)
Cooling degree days363 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.12 kWh per m² per day
Wind at 50 m3.6 m/s average
Water stress todayMedium - High (20-40%) (Bitola)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050High (40-80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does :IW Connect use?

We estimate the facility power at about 0.8 MW. Estimate from building footprint, low confidence.

How close is :IW Connect to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (110 kV), about 3.7 km away.

How clean is the power for :IW Connect?

The grid in North Macedonia emits about 467 g CO₂ per kWh (2025). Largest sources: coal 34%, solar 20.4%, hydro 19.8%.

Data centers near Bitola

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.