Key facts
| Status | Operational |
|---|---|
| Operator | Faculty of Computer Science and Engineering, Ss. Cyril and Methodius University in Skopje |
| Networks | 1 networks, 1 internet exchanges PeeringDB. |
| Address | blvd. Goce Delcev 9 |
| Coordinates | 41.99264, 21.42803 |
| Website | finki.ukim.mk |
Power and grid
| Nearest high-voltage substation | ТС Југ Нова, 110 kV, 1.1 km away (ЕВН Македонија) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Unnamed substation, 400 kV, 5.7 km away |
| HV substations within 10 km | 7 |
| Power plants within 50 km | 269 MW in 4 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 467 g CO₂ per kWh (North Macedonia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 34%, solar 20.4%, hydro 19.8%, gas 17.9%, wind 4.3%. Clean power: 45.4% |
| Industrial power price | EUR 0.112 per kWh (North Macedonia, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 10.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 40.9 °C (2001 to 2025) |
| Cooling degree days | 390 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.94 kWh per m² per day |
| Wind at 50 m | 3.4 m/s average |
| Water stress today | High (40-80%) (North Macedonia) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Ss. Cyril and Methodius University - Rectorate to the power grid?
The nearest high-voltage substation in OpenStreetMap is ТС Југ Нова (110 kV), about 1.1 km away.
How clean is the power for Ss. Cyril and Methodius University - Rectorate?
The grid in North Macedonia emits about 467 g CO₂ per kWh (2025). Largest sources: coal 34%, solar 20.4%, hydro 19.8%.
Who operates Ss. Cyril and Methodius University - Rectorate?
Faculty of Computer Science and Engineering, Ss. Cyril and Methodius University in Skopje.
Data centers near Skopje
- Neotel DC Skopje 1.9 km
- ФИНКИ data center in Skopje 2.0 km
- Faculty of Computer Science and Engineering 2.0 km
- Telesmart DC Skopje 3.9 km
- Elektra 20.5 km
- :IW Connect 107.9 km · 0.8 MW
More Faculty of Computer Science and Engineering, Ss. Cyril and Methodius University in Skopje data centers
- Faculty of Computer Science and Engineering North Macedonia
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.