Eni HPC6
Eni HPC6 is an operational AI data center operated by Eni in Sannazzaro de' Burgondi, Italy. Its power is about 14 MW. Epoch AI estimates about 2,688 H100-equivalent AI chips (NVIDIA P100, NVIDIA V100, NVIDIA A100, AMD Radeon Instinct MI250X).
Key facts
| Status | Operational |
|---|---|
| Operator | Eni |
| Facility power | 14 MW Reported (Epoch AI or owner data) |
| AI compute | 2,688 H100-equivalents |
| AI chips | NVIDIA P100, NVIDIA V100, NVIDIA A100, AMD Radeon Instinct MI250X Reported (Epoch AI or owner data) |
| Chip count | 13,888 Largest reported cluster at this site (Epoch AI). |
| GPU capacity if all AI | about 6,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Via per la Corradina, 35, 27032 Ferrera Erbognone PV, Italy |
| Coordinates | 45.10108, 8.85965 |
Power and grid
| Nearest high-voltage substation | Ferrera Erbognone, 380 kV, 500 m away (Enipower) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 8 |
| Power plants within 50 km | 4.1 GW in 9 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 285 g CO₂ per kWh (Italy, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 47.4%, solar 16.8%, hydro 15.7%, wind 8.1%, bioenergy 5.9%. Clean power: 48.7% |
| Industrial power price | EUR 0.173 per kWh (Italy, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 13.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 40.8 °C (2001 to 2025) |
| Cooling degree days | 633 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.78 kWh per m² per day |
| Wind at 50 m | 3.5 m/s average |
| Water stress today | High (40-80%) (Italy) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
GPU clusters at this site
| Cluster | Chips | Count | Power | Since |
|---|---|---|---|---|
| Eni HPC4 Phase 1 | NVIDIA P100 | 3,170 | 2.5 MW | 2018-01-18 |
| Eni HPC5 | NVIDIA V100 | 7,280 | 4 MW | 2020-02-21 |
| Eni HPC4 Phase 2 | NVIDIA A100 + NVIDIA V100 | 3,000 | 2 MW | 2021-10-30 |
| Eni HPC6 | AMD Radeon Instinct MI250X | 13,888 | 14 MW | 2024-11-18 |
Source: Epoch AI GPU Clusters.
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Eni HPC6 use?
Public data puts the facility power at about 14 MW. Reported (Epoch AI or owner data).
What chips does Eni HPC6 use?
Reported chips: NVIDIA P100, NVIDIA V100, NVIDIA A100, AMD Radeon Instinct MI250X.
How close is Eni HPC6 to the power grid?
The nearest high-voltage substation in OpenStreetMap is Ferrera Erbognone (380 kV), about 500 m away.
How clean is the power for Eni HPC6?
The grid in Italy emits about 285 g CO₂ per kWh (2025). Largest sources: gas 47.4%, solar 16.8%, hydro 15.7%.
Who operates Eni HPC6?
Eni.
Data centers near Sannazzaro de' Burgondi
- Data center in Sannazzaro de' Burgondi 225 m · 29 MW
- TIM data center in Voghera 16.6 km
- Noviglio Datacenter Mxp 31.7 km · 27 MW
- Equinix ML3 - Milan, Basiglio 36.0 km · 2.1 MW
- STACK MILL2 36.9 km · 8.4 MW
- Data center in Siziano 37.0 km
- STACK MILL1B 37.2 km · 12 MW
- Vaultica Data Centers | MIL01 37.3 km · 12 MW
More Eni data centers
- Eni HPC2 Italy
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.