Equinix SV1/SV5/SV10 - Silicon Valley, San Jose is an operational data center operated by Equinix in San Jose, United States. Our footprint estimate of its power is about 36 MW.

Key facts

StatusOperational
OperatorEquinix
Facility power36 MW (range 18 MW to 57 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 29,668 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 15,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks284 networks, 8 internet exchanges
PeeringDB.
Also known asEquinix SV5 · Equinix SV10 · Equinix SV11 · Equinix SV1
Address11 Great Oaks Blvd
Coordinates37.24177, -121.78297
Websiteequinix.com/locations/americas-colocation/united-states-colocation/silicon-valley-data-centers

Power and grid

Nearest high-voltage substationHumminbird Substation, 115 kV, 400 m away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationMetcalf Substation, 500 kV, 3.9 km away
HV substations within 10 km8
UtilityPacific Gas & Electric Co. (investor owned)
Electric retail service territory (HIFLD, US government).
Balancing authorityCISO
Nearest gas pipelineCalifornia Gas Transmission Co, intrastate pipeline, 2.1 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km3.7 GW in 23 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity189 g CO₂ per kWh (California, 2025)
Average of all power made in the area. Ember.
Grid power mixsolar 37.4%, gas 30.4%, hydro 11.7%, nuclear 7.3%, wind 6.7%. Clean power: 69.7%
Industrial power priceUSD 0.241 per kWh (California, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature13.7 °C
NASA POWER, average of 2001 to 2025.
Highest temperature41.7 °C (2001 to 2025)
Cooling degree days167 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy5.32 kWh per m² per day
Wind at 50 m4 m/s average
Water stress todayExtremely High (>80%) (California)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Extremely High (>80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Equinix SV1/SV5/SV10 - Silicon Valley, San Jose use?

We estimate the facility power at about 36 MW. Estimate from building footprint, low confidence.

How close is Equinix SV1/SV5/SV10 - Silicon Valley, San Jose to the power grid?

The nearest high-voltage substation in OpenStreetMap is Humminbird Substation (115 kV), about 400 m away. The local utility is Pacific Gas & Electric Co., in the CISO balancing area.

How clean is the power for Equinix SV1/SV5/SV10 - Silicon Valley, San Jose?

The grid in California emits about 189 g CO₂ per kWh (2025). Largest sources: solar 37.4%, gas 30.4%, hydro 11.7%.

Who operates Equinix SV1/SV5/SV10 - Silicon Valley, San Jose?

Equinix.

Data centers near San Jose

More Equinix data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.