EXA Edge DC Villars-Sainte-Croix

EXA Edge DC Villars-Sainte-Croix is an operational data center operated by EXA Infrastructure in Villars-Ste-Croix, Switzerland. No power figure is public for this site yet.

Key facts

StatusOperational
OperatorEXA Infrastructure
AddressLa Pierreire 6, 1029 Villars-Ste-Croix
Coordinates46.56145, 6.56373
Websiteexainfra.net/services/colocation

Power and grid

Nearest high-voltage substationBanlieue Ouest, 220 kV, 1.8 km away (Swissgrid)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km6
Power plants within 50 km238 MW in 13 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity39 g CO₂ per kWh (Switzerland, 2025)
Average of all power made in the area. Ember.
Grid power mixhydro 52.3%, nuclear 29.9%, solar 12.1%, oil and other fossil 1.9%, bioenergy 1.6%. Clean power: 97.7%

Climate and water

Average temperature9 °C
NASA POWER, average of 2001 to 2025.
Highest temperature35.9 °C (2001 to 2025)
Cooling degree days132 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.59 kWh per m² per day
Wind at 50 m4.6 m/s average
Water stress todayLow (<10%) (Vaud)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low (<10%)
Business-as-usual scenario.

Satellite view

Questions

How close is EXA Edge DC Villars-Sainte-Croix to the power grid?

The nearest high-voltage substation in OpenStreetMap is Banlieue Ouest (220 kV), about 1.8 km away.

How clean is the power for EXA Edge DC Villars-Sainte-Croix?

The grid in Switzerland emits about 39 g CO₂ per kWh (2025). Largest sources: hydro 52.3%, nuclear 29.9%, solar 12.1%.

Who operates EXA Edge DC Villars-Sainte-Croix?

EXA Infrastructure.

Data centers near Villars-Ste-Croix

More EXA Infrastructure data centers

Sources

Correct this page or get the data