EZ Network Systems
EZ Network Systems is an operational data center operated by EZ Network Systems in Stockton, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | EZ Network Systems |
| Networks | 1 networks PeeringDB. |
| Address | 4203 Coronado Ave., Suite 4 |
| Coordinates | 37.99079, -121.28982 |
| Website | ezisp.net |
Power and grid
| Utility | Lathrop Irrigation District Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | CISO |
| Nearest gas pipeline | California Gas Transmission Co, intrastate pipeline, 1.8 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 189 g CO₂ per kWh (California, 2025) Average of all power made in the area. Ember. |
| Grid power mix | solar 37.4%, gas 30.4%, hydro 11.7%, nuclear 7.3%, wind 6.7%. Clean power: 69.7% |
| Industrial power price | USD 0.241 per kWh (California, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 16.4 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 47.3 °C (2001 to 2025) |
| Cooling degree days | 890 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.23 kWh per m² per day |
| Wind at 50 m | 4.6 m/s average |
| Water stress today | Extremely High (>80%) (California) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How clean is the power for EZ Network Systems?
The grid in California emits about 189 g CO₂ per kWh (2025). Largest sources: solar 37.4%, gas 30.4%, hydro 11.7%.
Who operates EZ Network Systems?
EZ Network Systems.
Data centers near Stockton
- Modesto Junior College West Data Center 42.3 km · 0.6 MW
- Volt Modesto 46.3 km
- 801 Tenth Street Modesto (Ayera) 46.8 km
- Lawrence Livermore NL RZAdams 50.5 km · 2.1 MW
- Lawrence Livermore NL El Capitan 54.3 km · 35 MW
- QES Computers 62.9 km
- Petadata 77.8 km
- Hurricane Electric Fremont 1 79.3 km · 11 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.