Foremost San Antonio
Foremost San Antonio is an operational data center operated by Foremost Telecommunications in San Antonio, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Foremost Telecommunications |
| Address | 100 Taylor St Ste 260 |
| Coordinates | 29.42938, -98.48731 |
| Website | foremosttelecom.com |
Power and grid
| Utility | City Of San Antonio (municipal) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | ERCO |
| Nearest gas pipeline | El Paso Texas Pipeline Co, intrastate pipeline, 10.4 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 379 g CO₂ per kWh (Texas, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 48.3%, wind 21.7%, coal 11.6%, solar 10.7%, nuclear 7%. Clean power: 39.8% |
| Industrial power price | USD 0.072 per kWh (Texas, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 20.6 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 44.5 °C (2001 to 2025) |
| Cooling degree days | 1,804 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.84 kWh per m² per day |
| Wind at 50 m | 6.1 m/s average |
| Water stress today | High (40-80%) (Texas) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How clean is the power for Foremost San Antonio?
The grid in Texas emits about 379 g CO₂ per kWh (2025). Largest sources: gas 48.3%, wind 21.7%, coal 11.6%.
Who operates Foremost San Antonio?
Foremost Telecommunications.
Data centers near San Antonio
- H5 Data Centers San Antonio 50 m · 3.5 MW
- Microsoft SAT40 926 m · 106 MW
- Lumen San Antonio 2 2.1 km · 1.3 MW
- Lumen San Antonio 1 10.7 km
- Data center in Leon Valley 14.9 km · 16 MW
- Texas Cryptologic Center 15.0 km · 4.7 MW
- Data center in Leon Valley 15.3 km · 7.2 MW
- QTS San Antonio 16.2 km · 15 MW
More Foremost Telecommunications data centers
- Foremost Corpus Christi United States
- Foremost Dallas United States
- Foremost Harlingen United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.